Internal Wall Insulation in Alexandria and the Vale of Leven: Warm Rooms Behind Red Sandstone
Alexandria internal wall insulation carries our 25-year workmanship guarantee, from the first lime coat on the stone to the finished plaster.
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
The Damp Risk Behind Insulating a Red Sandstone Flat
Internal wall insulation in Alexandria should make your red sandstone flat warmer and cheaper to heat.
-
The worry is damp.
-
Your floor joists, the timber beams that carry each floor, rest their ends in that outside wall, and trapped moisture rots them first.
-
The Vale mixes old sandstone with post-war concrete and cavity-wall housing.
-
Foil-backed plastic foam board can suit the newer houses.
-
Fixed to sandstone, it stops the wall drying out, and the damp stays in the stone.
-
In a flat, space and plasterwork matter too.
-
Each insulated outside wall comes about 120mm further into the room.
-
Cornicing on that wall has to come down.
-
It is recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
Botched jobs are common enough that the National Audit Office counted them.
Its October 2025 report found major defects in about 98% of wall insulation fitted outside and 29% fitted inside under the ECO4 and GBIS schemes, across more than 30,000 homes.
A warmer flat with sound joists is what you are after, and we plan the walls around it.
We strip the old lath and plaster back to bare stone, then fit layers that all let damp through, so damp in the stone can still escape into the room.
A rendered brick section can take a sealed system instead, and at the survey we mark which of your walls suit vapour-open internal wall insulation and which suit the sealed one.
The same layers go into stone flats a few miles down the Leven, where we fit internal wall insulation in Dumbarton.
Your flat holds its heat, and the joist ends in that outside wall stay dry.
Our process
Internal Wall Insulation in Alexandria, Step by Step
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free survey and tailored design
Calum or Lewis, our surveyor, walks each room, checks how the walls are built and looks for any damp already there. Then we choose the layers from designs already checked for Scottish stone walls.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist installation
The crew takes the wall back to bare stone, and our lime plasterer puts on a thin first coat of lime. Next come two 50mm layers of IndiNature’s IndiTherm hemp, pressed into a 45mm frame, and a 15mm wood wool board. Two coats of lime plaster on mesh finish the wall.
-
Step 4
Aftercare and guarantee
At handover you get photographs of each layer the plaster now hides, the written guarantee and a note on which paints suit lime.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Next step
Find out what your flat’s walls need, and what the grant could take off.
Bring your questions about the joist ends, the cornicing and the room you would lose, and you get straight answers in your own flat.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Vale of Leven Homeowners Choose Us for Solid Wall Insulation
Insulation planned around how your Alexandria walls take in damp and dry out.
-
We confirm your wall is solid stone first
The survey checks what the wall is made of before anyone mentions hemp or lime. If it turns out to be cavity or concrete, you hear that on the day.
-
Two systems, both priced in writing
If your sandstone house has a brick section, rendered or not, we price both systems and set out the pros and cons of each.
-
We fit what suits wet sandstone
Foam board glued to stone goes up faster and quotes cheaper. On wet sandstone it could cost you a rotten joist end, so we don’t fit it there.
-
People you can name
Customers name Lyall, Abs, Kyle and Chris in their Google reviews, and keep mentioning tidy, communicative crews.
-
We tell you when the wall isn’t ready
A leaking gutter or failed pointing has to be fixed from outside first, and we say so before we quote.
-
Credentials the grant needs
Home Energy Scotland requires a TrustMark-registered installer for solid wall work. We are one, and our PAS 2030 accreditation covers the internal wall insulation we fit in the Vale.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, the plaster mouldings are recreated in lime, and at the survey we agree who does that and who remakes the woodwork.
Internal Wall Insulation Grant for Alexandria Homes, and What the Work Costs
Insulating the old stone walls of an Alexandria flat or house from the inside costs £10,000 to £50,000, and a typical job comes to £14,000 to £25,000.
On higher-risk Alexandria stone walls, we bring in an outside PAS 2035 retrofit coordinator, a specialist who checks the moisture risk.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
Home Energy Scotland’s grant pays up to 75% of the cost of solid wall insulation, capped at £7,500 per property, so a full grant leaves about £6,500 to £17,500 for you to pay.
- We help you through each step of the solid wall insulation grant application.
- Wall work on its own stays at £7,500 at any address.
A qualifying rural or island postcode raises the cap for the whole property to £9,000, which only helps if you insulate a loft or floor as well as the walls.
- Home Energy Scotland runs the application and only funds TrustMark-registered installers like us, and not everyone who applies qualifies.
- An optional interest-free loan of up to £2,500 is available for the walls.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Alexandria, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. Before any work starts, we can show you the modelled damp risk for a wall like yours as a figure on paper.
Ask your own questions about internal wall insulation in Alexandria.
Call Calum with your street and what you know about your walls. He’ll tell you what a survey would check and which insulation could suit your house.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
You get the same three terms anywhere in the Vale.
-
25-year workmanship guarantee
Every wall we line carries our workmanship guarantee for 25 years from completion.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
Nothing is due before the work starts, and the invoice comes when the job is finished.
-
Payment on 7-day terms
You pay within seven days of completion, after you’ve walked round the finished walls.
Internal Wall Insulation in Alexandria and the Vale: Your Questions
Straight answers on cost, grants, systems and coverage area.
Not when each layer lets moisture pass. Foil-backed foam board fixed to the stone traps the moisture the wall used to let out.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓A typical job costs £14,000 to £25,000 before the grant. The number of outside walls sets most of the price, so a top-floor flat with two costs far less than a villa with four walls and a bay.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Yes, once Home Energy Scotland approves your application. The grant is up to 75% of the cost, and wall work is capped at £7,500 anywhere in the Vale.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Plan on about 120mm per wall. The layers add up to 105 to 125mm from bare stone: 90mm of pressed hemp, 15mm of wood wool board, the lime coat and two coats of plaster. Cornicing on outside walls comes down and is recreated in lime. Features on inside walls stay put.
Only if the building is listed. Listed building consent covers inside work that changes a building’s character, and lining an outside wall usually does. Check with West Dunbartonshire Council if you’re unsure of your building’s status.
Sandstone built before 1919 is almost always solid stone. Post-war houses in the valley are built differently. Measure the wall at a window opening. Well over a foot thick points to solid stone.
Allow several weeks, most of it for the lime to dry. If you’re living there, we work one room at a time, and you get the schedule in writing with the quote.