Internal Wall Insulation in Biggar: A Warmer Stone House That Still Dries Out
Rooms in a Biggar stone house hold their warmth for longer after the heating goes off once internal wall insulation lines the outside walls.
Insulation installation
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Biggar: Where Damp Comes From in Old Stone
You would like the house warmer, and lining the walls from inside is the obvious way to get there. Line an old stone wall with the wrong board, though, and the damp inside it has nowhere to go.
-
That is the main risk with internal wall insulation in Biggar.
-
Biggar’s older houses have thick walls of rough stone, some with a harled front (a rough lime render).
-
There is no cavity, so any rain that gets in has to dry out through the stone, the lime joints and the harl.
-
Trouble starts when both sides of the wall get sealed, with hard cement in the joints outside and foam board stuck on inside.
-
The water stays trapped, and you see damp patches low on the wall.
-
The floor timbers beside it can rot.
-
You may also be unsure what the grant pays, or how much room each wall will lose. We answer both at the survey, and you get the figures in writing.
In October 2025 the National Audit Office reported on wall insulation from the ECO4 and GBIS government grant schemes.
The report puts major defects at around 98% of external and 29% of internal jobs.
That comes to more than 30,000 homes.
We plan the job in the order old stone needs.
First we check that the outside can still dry, then we build an inside lining that damp can pass through (trade name: vapour-open).
All our internal wall insulation follows that order, from bare stone to lime finish.
Your rooms warm up, and the thick stone walls go on shedding rain the way they were built to.
Our process
Internal Wall Insulation in Biggar, From Survey to Finish
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
1. Free survey and a written design
Calum or Lewis, our surveyor, visits and checks the mortar, the harl and the inside plaster on each outside wall. You get the layer plan and the reasons in writing before any price, and Calum signs it off.
-
The split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 2
2. Installation at the pace lime allows
Our installers strip the old plaster, then frame the wall and fit the hemp. Our lime plasterer adds the finish coats. Lime dries between coats, so plan on weeks.
-
Step 3
3. Aftercare and guarantee
We tell you which paints won’t seal the lime, and the walls carry our 25-year workmanship guarantee from completion.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Next step
Get a straight answer on whether your Biggar walls are ready to line, and what the job costs.
Point out the coldest rooms, and the Biggar survey starts there.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Biggar Owners Choose Us for Internal Wall Insulation
Insulation planned around how your Biggar walls take in damp and dry out.
-
Our survey starts outside
It checks the mortar joints and harl, because cement where lime should be stops the wall drying. We tell you if an outside repair should come first.
-
Lime, hemp and wood wool against the stone
We start with a lime skim pressed onto the bare stone to close the air gaps. Next come two 50mm layers of IndiTherm hemp in a 45mm frame. IndiNature makes that hemp in Scotland. Then we add 15mm wood wool board and finish with two coats of lime on mesh.
-
A tested layer plan for your kind of wall
We match your wall to one of the layer plans in our library. We checked each plan in WUFI, a computer model that predicts where damp will collect in a wall.
-
A different system for brick extensions
Rendered brick lets little rain in from outside. So a rendered brick extension can take hemp behind a Pro Clima Intello Plus membrane, a sheet that keeps damp room air out of the wall. Plasterboard and a plaster skim go over it. If your house needs both systems, we price each one.
-
One lime plasterer on every heritage wall
We hand the first coat and the finish to our trusted lime plasterer, who knows how long lime needs before the next coat.
-
Photographs of the layers the plaster hides
You get photos of every stage, from bare stone to finished lime, so you can see what sits inside your wall.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, the plaster mouldings are recreated in lime, and at the survey we agree who does that work and who remakes the woodwork.
Internal Wall Insulation Grants and Costs for Biggar Homes
Heritage internal wall insulation costs £10,000 to £50,000, and most jobs land at £14,000 to £25,000.
Wall area sets the price, so a single-storey terraced house with two outside walls costs far less than a detached villa.
We also fit internal wall insulation in Lanark and across Clydesdale.
Cement pointing outside can stop a Biggar wall drying, so we flag any repair it needs before we line the inside.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
Take off a full £7,500 grant and your share becomes about £6,500 to £17,500.
- Home Energy Scotland pays up to 75% of the cost, capped at £7,500, through its solid wall grant, and it decides who qualifies.
- It also offers an optional interest-free loan for wall work, up to £2,500.
If your postcode counts as rural, the cap for the whole property rises to £9,000, but the wall grant itself stays at £7,500, so the extra only helps if loft or underfloor insulation goes in with the walls.
- The work needs a TrustMark-registered installer. We are one, and we supply the documents Home Energy Scotland asks for.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Biggar, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. Before any work starts, we can show you the modelled damp risk for a wall like yours as a figure on paper.
Ask your own questions about internal wall insulation in Biggar.
Tell Calum your Biggar address and whether the front is bare stone, harl or paint. You can book your free survey on the same call.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
TrustMark registered, PAS 2030 accredited. We’re rated 5.0 on Google across more than 100 reviews.
-
25-year workmanship guarantee
If our work on your walls fails in that time, we come back and repair it.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
You owe nothing until the walls are finished.
-
Payment on 7-day terms
The invoice comes when the job is finished. You then have seven days to pay, after you’ve seen the walls and photographs.
Your Questions on Internal Wall Insulation in Biggar
Straight answers on cost, grants, systems and coverage area.
Not if the lining lets damp pass through and the wall is sound. Sealed board inside and cement outside are the two usual reasons internal wall insulation causes damp, and the survey checks for both.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Heritage work runs £10,000 to £50,000, typically £14,000 to £25,000. After a full grant you would pay about £6,500 to £17,500, priced wall by wall.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Yes, if the wall is solid and Home Energy Scotland approves you. It pays up to 75%, capped at £7,500, and you can add an optional loan of up to £2,500. We handle the installer side of your solid wall insulation grant application.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓You may, if you get listed building consent first. It covers inside work as well as outside. If your house is unlisted, conservation area rules rarely stop work inside. South Lanarkshire Council can confirm your house’s status.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓It changes what the survey checks outside. The inside lining still lets damp escape. Cement render or thick masonry paint slows how fast a lime harl dries, and we note any cracked render with water behind it.
Cornicing on an outside wall comes down and is recreated in lime. Each lined wall comes 105 to 125mm into the room, so allow 120mm when you plan furniture. You choose which walls to line.
Yes, with the same survey, systems and grant route. Home Energy Scotland checks each village address against its rural rules.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.