Internal Wall Insulation in Bonnyrigg and Lasswade When a Stone Home Is Mid-Renovation
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Internal Wall Insulation in Bonnyrigg While the Plaster Is Already Off
Internal wall insulation in Bonnyrigg and Lasswade tends to come up when the plaster is coming off anyway, after a move or ahead of a rewire.
-
It’s a job you want to do once, because a wrong lining means opening the walls up again.
-
The older cottages, Victorian terraces and villas in both towns are built of solid stone, with no cavity to fill.
-
Rain soaks into that stone and dries out through the lime mortar and plaster, so the new lining has to leave that route open.
-
Glue foil-backed plastic foam board to the stone and the wall can only dry outwards.
-
The joist ends buried in the wall suffer first.
-
Timber that stays wet behind new plaster can rot for years without anyone seeing it.
-
Then there are the rooms themselves.
-
A lined outside wall moves about 120mm inwards, and cornicing or shutters on it come off.
-
We measure each wall at the survey, so the loss is known before you agree to anything.
Scheme-funded wall insulation has a poor record.
When the National Audit Office looked at ECO4 and GBIS work, it found major defects in around 98% of outside insulation and 29% of inside insulation, across more than 30,000 homes.
A thin lime coat goes on the bare stone first.
Scottish hemp then fills a timber frame, with wood wool board over it and lime plaster to finish. It’s the same approach behind our internal wall insulation on stone walls.
For stone, we fit layers that let damp escape (the trade term is vapour-open).
Our process
Internal Wall Insulation in Bonnyrigg: Our Process From Survey to Lime Plaster
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
We check every outside wall inside and out, note any cement or paint that slows drying, and ask how you use the rooms. Calum signs off your written quote.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
Once the wall is stripped to bare stone, our lime plasterer puts a thin first coat on it. The frame, hemp and wood wool go in next, then two coats of lime plaster.
-
Step 4
Aftercare and Guarantee
Before the plaster covers it, we photograph the hemp and frame so you have a record. At handover you get the 25-year workmanship guarantee in writing and a list of paints that suit lime.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Bonnyrigg and Lasswade Owners Choose Us for Stone Walls
Insulation planned around how your Bonnyrigg and Lasswade walls take in damp and dry out.
-
A clear recommendation, with the reasons written down
Calum or Lewis, our surveyor, goes over the stone, pointing, plaster and any damp. Your quote names the lining we’d fit and why it suits that wall.
-
Tested layer designs for Scottish walls
Calum matches your wall type to one of our tested layer designs, each checked in WUFI moisture software for how it handles damp.
-
Hemp against the stone, even though it costs us more
Every hemp job leaves us a smaller margin than foam board would. We fit it anyway, because old stone has to keep drying.
-
Cornicing and shutters planned before we start
At the survey we go through which features come off each outside wall and how much depth each room loses, so you can plan each room around it.
-
Surveys booked in, crews travel through
Bonnyrigg is about an hour from our East Kilbride base. We book your survey ahead and our crews travel through for heritage work, as they do for stone houses in Dalkeith.
-
On the register the grant depends on
Home Energy Scotland pays its solid wall grant only if a TrustMark-registered installer fits the work. Our name is on that register, and we hold PAS 2030 accreditation.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
What Internal Wall Insulation in Bonnyrigg Costs After the Grant
Expect a typical stone wall job to cost £14,000 to £25,000, and the Home Energy Scotland grant can take up to £7,500 off that.
Prices start around £10,000 and a big villa can reach £50,000.
The number of outside walls and what sits behind the old plaster drive internal wall insulation costs more than anything else.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
If you get the full grant, you’re left with about £6,500 on a £14,000 job and about £17,500 on a £25,000 one.
- Home Energy Scotland (HES) will pay up to 75% of the bill, to a maximum of £7,500 for solid wall insulation.
- The £7,500 wall cap is the same in every postcode.
Rural and island addresses get a whole-house cap of £9,000, and that extra £1,500 is only reachable by adding a loft or floor to the job.
- The application goes through HES, and HES makes the decision.
- HES also lends up to £2,500 interest-free for solid wall work.
- Our part is answering your questions and sending the installer paperwork HES needs before it can pay a solid wall insulation grant.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Bonnyrigg and Lasswade, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Bonnyrigg and Lasswade.
Halfway through a renovation and unsure what’s behind your plaster? Calum or Lewis sees the wall itself on the free survey and explains what it means for the lining.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
Should our workmanship let you down, we return and fix it.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
Your money stays in your account until the job is done.
-
Payment within 7 days of completion
You’re invoiced when the job is finished and have seven days to settle it.
What Bonnyrigg and Lasswade Homeowners Ask About Internal Wall Insulation
Straight answers on cost, grants, systems and coverage area.
A typical job runs from £14,000 to £25,000. If your household qualifies for the full £7,500 grant, you’d pay about £6,500 to £17,500. Small jobs start near £10,000 and a large villa can reach £50,000.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓It can if the stone gets sealed in. Damp trouble starts when old stone sits behind foil-backed foam board. Hemp and lime let moisture move out, and the survey picks up any existing damp to fix first.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Hemp and lime, for solid stone. Foam board blocks the drying that stone relies on, the main point in any comparison of hemp and foam board on solid walls. Brick that soaks up little water gets hemp behind a membrane instead.
Yes, if your household qualifies. HES pays up to 75%, with £7,500 the most it gives for solid wall work, and it can also lend up to £2,500 interest-free. It only funds TrustMark-registered installers.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓The lining adds 105 to 125mm to each wall, so plan on about 120mm. Any cornicing or plaster mouldings on the lined wall come down. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
Yes. A listed building needs listed building consent from Midlothian Council before its walls are lined. If the house is unlisted, inside work needs no planning permission, even in a conservation area.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓Typically one to three weeks, depending on drying time. Lime plaster goes on in coats and each one needs days to dry before the next, so the work is planned around that drying.
Yes, all three. Surveys there go in the diary like any Midlothian booking, and the crew travels through from East Kilbride for the work.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



