Internal Wall Insulation in Eaglesham for Cosy Rooms in Old Stone Cottages
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Eaglesham: Damp, Rot and Lost Room Space
Stone walls soak up rain and dry it out again.
-
Put the wrong lining on the inside and the damp stays in the wall, where joist ends and window timbers can rot.
-
Settle that risk first, before you pay anyone for internal wall insulation in Eaglesham.
-
Eaglesham’s older cottages and terraced houses are solid stone, with no cavity to fill.
-
Cottage rooms are often small, so space is the second worry.
-
Lining a wall takes about 120mm off the room, and on a narrow wall you notice every centimetre.
-
A cheaper installer might glue foil-backed plastic foam board straight to the stone.
-
It stops the wall drying towards the room, so damp can build up behind the board where nobody sees it.
-
If a room has cornices on an outside wall, those cornices come down.
-
They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
The National Audit Office reviewed wall insulation fitted under ECO4 and GBIS and found major defects in more than 30,000 homes.
That covered about 29% of inside jobs and about 98% of outside ones.
We line stone with hemp and lime internal wall insulation instead. A thin lime coat goes onto the bare stone.
Next we fit a timber frame packed with Scottish hemp, then wood wool board and lime plaster.
Damp passes through every layer, which is what “vapour-open” means.
Our process
Internal Wall Insulation in Eaglesham: Our Process, Step by Step
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Lewis, our surveyor, or Calum checks the walls inside and out and asks which rooms you use most. Your written quote then prices each option side by side.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
The crew strips the plaster back to stone, and our lime plasterer adds a thin first coat. Then come the timber frame, hemp and wood wool board, and a lime finish in two coats, each given days to dry.
-
Step 4
Aftercare and Guarantee
You get photos of each stage, including the layers the plaster now hides, and advice on which paints let lime keep drying. Your 25-year workmanship guarantee comes with the handover papers.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Eaglesham Cottage Owners Trust Us With Their Stone Walls
Insulation planned around how your Eaglesham walls take in damp and dry out.
-
We look at the outside before the inside
Calum or Lewis, our surveyor, starts with the outer face of the wall. Paint, render or cement pointing slows the drying, so it changes what we fit indoors.
-
A lining matched to your wall type
We pick from a library of layer designs for Scottish stone walls, each tested in WUFI moisture modelling software. Rubble cottage walls and smooth-cut stone villas get different answers.
-
Room loss measured before you sign
The survey works out how much depth each wall gives up, window reveals included, so you see the room loss before you sign.
-
Our margin is thinner on hemp and lime
Natural materials cost us more than foam board. We recommend them anyway, because stone needs to dry and a lining that traps damp costs you more later.
-
Close by in East Kilbride
Our base sits just over the council boundary in East Kilbride, so Eaglesham is a short drive for our surveyors and crews.
-
TrustMark registration opens the grant
Home Energy Scotland funds wall work only through a TrustMark-registered installer. Our name is on that register, so choosing us keeps the grant route open. We install to PAS 2030.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
What Internal Wall Insulation in Eaglesham Costs Under the £7,500 Grant Cap
Prices run from £10,000 to £50,000, with typical jobs landing at £14,000 to £25,000.
The spread comes mainly from how many outside walls you have and the state of the stone under the plaster, the two biggest factors in internal wall insulation prices.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
Take a £14,000 job: with the full grant, about £6,500 is left for you.
On £25,000, about £17,500 is left, if your household qualifies.
- Home Energy Scotland (HES) pays up to 75% of solid wall insulation costs, to a cap of £7,500.
- Your postcode never lifts the £7,500 wall cap.
In a rural or island postcode, HES raises the whole-house limit to £9,000. The extra £1,500 only helps if a loft or floor goes in with the walls.
- The application goes to HES, and HES makes the call.
- HES can also lend up to £2,500 towards solid wall work, interest free.
- We’re on hand for your questions and provide the paperwork HES needs from the installer, which is our whole part in a solid wall grant application.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Eaglesham, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Eaglesham.
Some rooms colder than others, or unsure if the outside of your Eaglesham house is bare stone or painted? Calum or Lewis looks at both during the free survey and talks you through the lining that suits each wall.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
It covers our work on your walls, and you get it in writing at handover.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
We ask for nothing upfront.
-
Payment within 7 days of completion
We invoice when the final lime coat is finished, and you get a week to pay.
Internal Wall Insulation in Eaglesham: Questions From Cottage Owners
Straight answers on cost, grants, systems and coverage area.
For a typical job, budget £14,000 to £25,000. Smaller jobs start near £10,000 and the biggest reach £50,000. A qualifying household with the full £7,500 grant pays roughly £6,500 to £17,500 of a typical job.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Count on losing roughly 120mm of floor in front of each lined wall, and the window recesses get deeper too. That figure is how thick internal wall insulation is once every layer is on. Calum or Lewis measures each room at the survey, wall by wall.
It can, if the lining stops the stone drying. Foam board and foil do that. Hemp, wood wool and lime let damp move through to the room side, so the wall keeps drying. If a wall is already wet, the cause needs fixing before any lining goes on.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Not for an unlisted house. Internal work like this needs no planning permission in a conservation area. If the house is listed, you need listed building consent from East Renfrewshire Council before the walls are lined, so check its status before the survey.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓It covers part of the cost. HES covers up to 75% for a qualifying household, and £7,500 is the most it pays towards solid wall work. It decides from your application and postcode, and it only funds TrustMark-registered installers like us.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Around one to three weeks for a typical job, since the lime goes on in coats and each one must dry first. A cottage with two outside walls finishes sooner than a detached house with four.
Yes, all three are close to our East Kilbride base. In Clarkston too, we fit hemp and lime in period houses needing internal wall insulation.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



