Internal wall insulation in Edinburgh that keeps stone walls dry and rooms warm
Hemp, wood wool and lime insulation for Edinburgh’s pre-1919 sandstone homes, fitted so the stone can keep drying out. Surveyed and designed for your wall type from our WUFI-checked build-ups, with Home Energy Scotland grant funding if you qualify.
Top-floor tenement, conservation area

Insulating stone walls in Edinburgh: why the standard approach fails
Your sandstone tenement, terrace or villa in Edinburgh is cold and dear to heat, and your worry is probably that insulating it will trap damp and rot the stone.
Those walls are solid, with no cavity.
Rain soaks a little way into the stone, then dries back out through the lime plaster and the wall face.
That drying cycle is why these buildings are still sound after 150 years, and most modern insulation stops it.
Foil-backed boards stuck straight onto solid stone seal the moisture in.
The wall stays wet, condensation forms where warm room air meets cold stone, and the first signs are mould at the skirtings and rot in the joist ends.
The scale of the problem is on record.
In October 2025 the National Audit Office found that around 98% of external and 29% of internal wall insulation installed under the ECO4 and GBIS schemes had major defects, across more than 30,000 homes.
The common cause was a generic system applied to a wall it was never designed for.
If your Edinburgh home is listed, you have a conservation officer to satisfy as well as a cold house to warm.
So much of the city’s stone frontage is listed or sits inside a conservation area that external insulation is rarely even worth proposing.
The work has to happen on the inside, and on a listed interior it has to be a system you can justify to that officer.
Many people search for “breathable insulation” when they research this.
The accurate term is vapour-open, or vapour-permeable: a build-up that lets moisture keep moving through the wall instead of trapping it.
That is the internal wall insulation we install, with the moisture modelling to back it.
Your rooms stay warm and the stone keeps drying, with evidence a conservation officer can read.
Our process
Our simple process
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free survey and tailored design
Calum or Lewis, our surveyor, visits to check the wall construction, exposure and any existing damp, and talks through what you want from the rooms. You get a written quote, usually with more than one system option and the honest case for each. The survey and the quote are free.
What we check on your walls
- Wall construction. Sandstone, rubble stone or brick, and whether someone has rendered or painted it.
- Exposure. How much wind and rain the wall takes.
- Damp. We look for damp already in the wall before we build anything onto it.
- Your rooms. What you want from each room once the work is done.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
- Right for most stone
Heritage system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + Damp can escape, so the wall keeps drying
- + Can mostly be removed later, and protects the stone
- + Right for most solid sandstone walls
- − Costs more, takes longer, more prep
- − Slightly more room lost to depth
- On the right wall
Membrane system that holds room moisture back
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or is rendered or painted
- + Can be thinner in some cases
- − Only correct where modelling supports it
- − Wrong on a typical absorbent sandstone wall
-
Step 3
Specialist installation
Our own installers strip the wall and build the system stage by stage, with our lime plasterer on the lime coats, and photograph the work as it goes.
Lime needs time to cure between coats, so a vapour-open job runs in phases over weeks rather than days. We set out a realistic programme before we start, because lime that is rushed cracks.

-
Step 4
Aftercare and guarantee
Once the plaster has cured we walk the job with you, hand over the photographs and paint guidance, and back the work with our 25-year workmanship guarantee.
-
Our line in the sand
What we will not do
Sealed foam on solid sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to hit a budget. If that’s what it would take to land a cheaper number, we’ll tell you honestly and recommend against it.
Next step
Get a design for your own walls and a written price.
If your home is listed, the survey also shows you the evidence a consent application will need.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage systemStripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane systemStripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
A system designed for your wall, not pulled off a shelf.
We read how your wall is made and how it handles water before choosing a single layer. The six points below cover a typical heritage install.

Layers that let sandstone dry
We strip the wall back to bare stone and our lime plasterer gives it a thin coat of lime. Our own fitters then fit two 50mm layers of IndiTherm hemp, grown and made in Scotland by IndiNature, pressed into a 45mm timber frame, with wood wool board over that. The plasterer finishes in two coats of lime plaster, and we tell you which paints still let the wall dry.

Moisture evidence a conservation officer can read
We work from a library of WUFI-validated build-ups covering the common Scottish wall types, so we can show how a proposed system manages moisture in a wall like yours. For listed buildings that documentation supports the consent application rather than leaving you to argue the case alone.

Honest options, set out side by side
Not every wall wants the same answer. Rendered brick, or brick that soaks up little water, can suit a sealed build instead. That means hemp in a timber frame and a Pro Clima Intello Plus membrane, which keeps room moisture out, finished in plasterboard. We set out the pros and cons of each in plain terms.

Period features handled properly
Cornicing and features on external walls cannot stay in place during this work. We remove them. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work. Room depth reduces by the thickness of the build-up. We tell you both things at the survey, before you sign anything.

The owner signs off your design
Calum, who owns the company, leads the design and signs off every quote once he or Lewis, our surveyor, has seen your walls. Installation is done by our six employed installers, all trained on heritage work. You get photographs of the completed work, including the stages that end up hidden behind the plaster.

Edinburgh is where a large share of our wall work happens
We are based in East Kilbride and say so plainly. Around a third of our specialist wall insulation work is already in Edinburgh and the Lothians, and our crews make the trip routinely. You pay the same price and get the same guarantee and team as a job ten minutes from the yard.
The honest bit: period features
Existing cornicing, shutters and panelling on the walls we insulate must be removed and cannot be saved. The cornicing is recreated in lime once the insulation is in, and at the survey we agree who does that work and who remakes the woodwork.

Internal wall insulation cost and grants in Edinburgh
Honest numbers first. Internal wall insulation on solid stone runs from £10,000 to £50,000 depending on property size and the number of external walls. Most of our jobs sit between £14,000 and £25,000.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
For a household that qualifies for the grant, which caps at £7,500, a £14,000 job leaves around £6,500 to pay and a £25,000 job around £17,500.
The grant is worth taking seriously, and if you have been searching for wall insulation grants in Edinburgh, this is the scheme that matters.
- If you qualify, the Home Energy Scotland grant covers up to 75% of the cost of solid wall insulation, capped at £7,500 for walls in any postcode.
- An optional interest-free loan of up to £2,500 is available on top.
Some rural and island postcodes lift the whole-house cap to £9,000, which only helps if a loft or floor is done with the walls.
- The work must be carried out by a TrustMark-registered installer, which we are.
- Home Energy Scotland runs the application itself.
- We answer your questions and give HES what it needs from the installer side.
- Not everyone qualifies, so the sensible first step is a call to HES or a survey with us.
Home Energy Scotland’s grant is Scotland-only, separate from the English schemes you may have read about.
Why vapour-open, and why it matters for Scottish stone.
- 1Bare solid stone
Solid sandstone and rubble-stone walls manage water the way they always have: they absorb it and let it evaporate off both faces. No cavity, no membrane, no plastic. That works indefinitely, as long as the wall can keep drying.
- 2Foil-faced foam board
Foil-faced plastic foam board, stuck to the inside of the wall with blobs of adhesive, breaks that. It creates a cold, sealed layer where warm internal moisture reaches the stone, condenses, and has nowhere to go. That trapped condensation is the actual mechanism behind the damp people blame on insulation.
- 3Vapour-open build-up
A vapour-open system (lime, hemp, wood wool) lets that vapour pass through instead, so a well-designed wall stays warm and keeps drying. The brand of insulation matters far less than whether someone designed the build-up to let the wall dry.
Calculated, not guessed.
Our designs are built on WUFI modelling, simulating heat and moisture moving through a build-up over several years, the time a solid wall actually needs to dry to equilibrium: roughly five years for brick, ten for stone.
- About 5 yearsbrick, drying to equilibrium
- About 10 yearsstone, drying to equilibrium
An Edinburgh stone wall is matched to a build-up from our validated library, one already modelled against masonry like yours. So before any work starts, we can show you the modelled moisture result.

What homeowners ask before they commit.
Not when it is designed for the wall. We use vapour-open materials and base the design on modelling of how moisture behaves, so the wall keeps drying. That is also why a vapour-open build-up needs no conventional plastic vapour barrier.
A vapour-open build-up adds some depth. How much depends on the system, on how much space we gain back when the old lath and plaster comes off, and on the depth of the lime parge, which we do not know exactly until we open up. Plan on about 120mm per wall (usually 105mm to 125mm from the bare stone), and we confirm it room by room at survey.
At the survey we work out the depth for each room you plan to insulate.
Book Your Free Survey ↓On a solid-wall job, yes. To strip the wall back we have to remove the existing cornicing, shutters and panelling on those walls, and they cannot be saved. The cornicing is recreated in lime once the insulation is in, and at the survey we agree who does that work and who remakes the woodwork.
Usually yes. External insulation is normally unacceptable on a sandstone frontage, which is why internal vapour-open systems are the appropriate route. We have worked in conservation areas and will tell you honestly what is feasible.
Mention the listing or the conservation area when you book, so the survey covers what consent will need.
Book Your Free Survey ↓A vapour-open system protects the fabric and improves the EPC, both of which support the value of a period home. We will give you a straight view of payback for your situation.
Ballagan Farm, Strathblane
A full renovation of a two-storey farmhouse where the walls were damp from being poorly insulated. We stripped them back to the bare stone, parged them in lime, then insulated with IndiTherm hemp and wood-wool boards before finishing in lime plaster across both the sloping ceilings and the solid sandstone walls. The loft was insulated with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner preparing to install a heat pump and make the bedrooms comfortable year round. We used a vapour-permeable build-up of hemp, wood-wool board and lime plaster on the walls, paired with a vapour-closed system of PIR and Superfoil SF19+ on the sloping ceilings and dormers, plus Knauf Earthwool in the upper loft space.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period property. We installed a vapour-permeable system of 100mm Sisalwool, wood-wool board and lime plaster across four walls, including one large gable wall where the dropped ceiling was removed to create an insulated vaulted ceiling.
Belhaven Terrace Lane, Glasgow
A West End client looking to improve thermal performance across the whole home. The property was given internal wall insulation across the ground floor and room-in-roof insulation in the upstairs bedrooms. A vapour-open design for the stone walls was paired with vapour-closed insulation in the sloping ceilings, keeping the high-absorption sandstone able to dry while stopping warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
An internal wall insulation project carried out for a client of Oscar J Murray Architects as part of a whole-house renovation in Glasgow’s West End. We used IndiTherm hemp insulation on the stone walls, dormers and sloped ceilings, finished in lime plaster, with a Pro Clima Intello membrane on the sloping ceilings and Contega Solido airtightness tape around the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. We take no deposit, and payment is due on 7-day terms after the work is complete and you have seen it. If a company asks for thousands up front, ask them why.
- 25-year workmanship guarantee
If our workmanship fails, we come back and put it right.
- No deposit, pay after completion
No deposit, and payment is due within 7 days of completion.
Nothing is due while the lime coats are curing, only once the job is finished.
- TrustMark and PAS 2030 certified
Audited to the standards the grant requires, with Calum signing off every design before work starts.
Home Energy Scotland only funds solid wall work carried out by a TrustMark-registered installer, so choosing us keeps the grant open to you if you qualify.
- Our own employed fitters
No agency labour and honest advice. We turn down work that is not right for the wall.
Internal wall insulation: your questions answered.
Straight answers on cost, damp, room loss, grants and conservation areas.
It is insulation fitted to the inside face of a solid wall, used where there is no cavity to fill. On a stone home it should be a vapour-open build-up so the wall can keep drying.
The full range on solid stone is £10,000 to £50,000, driven by property size, the number of external walls and the condition of what we find behind the old plaster. Most jobs fall between £14,000 and £25,000. The Home Energy Scotland grant is capped at £7,500, so eligible households in that band typically pay between £6,500 and £17,500. Your survey quote gives you the real number for your property.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓It can, if the wrong system goes in. Non-permeable boards fixed to solid stone trap moisture in the wall, and that is where most damp complaints after insulation come from. Tenement wall insulation done properly uses a vapour-open build-up, hemp and lime in our case, so moisture keeps moving through the wall as the building was designed for. Done that way, insulation reduces condensation risk, because the inner wall surface stays warm.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Breathable is the everyday word for a vapour-open build-up (lime, hemp and wood wool) that lets moisture pass through rather than sealing it in. It is the appropriate approach for solid stone and sandstone walls, and it needs no conventional plastic vapour barrier. We tend to say vapour-open, because it is the more accurate term.
Yes, internally, and with listed building consent, which alterations of this kind normally require. External insulation on an ashlar Georgian frontage is not going to be approved, so the work happens on the room side. We support the consent application with WUFI-validated build-up documentation, the evidence a conservation officer will want to see.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓Features on external walls, cornicing included, have to come off for this work. Anyone who says otherwise is not describing a proper strip-back system. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work. Features on internal walls are untouched. Room depth on insulated walls reduces by the build-up thickness, confirmed at survey.
The Home Energy Scotland grant covers up to 75% of the cost of solid wall insulation, capped at £7,500, with a £1,500 uplift in eligible rural postcodes taking the combined cap to £9,000. An optional interest-free loan adds up to £2,500 on top. A TrustMark-registered installer is required. HES administers the application, and we provide what they need from our side and answer your questions throughout. Eligibility is not automatic, so check your circumstances with HES first.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Longer than plasterboard systems, and for good reason. Lime plaster needs to cure between coats, so a vapour-open installation runs in stages over a few weeks rather than days. The exact programme depends on how many rooms are done at once, and we set out a realistic timetable in the quote so you can plan around the work.
We do, and it is not a stretch for us. Around a third of our specialist wall insulation work is already in Edinburgh and the Lothians, and our employed crews travel through as a matter of routine. Price, programme and the 25-year guarantee are exactly the same as for a job on our doorstep.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



