Internal Wall Insulation in Giffnock That Keeps Solid Sandstone Walls Dry
Hemp, wood wool and lime wall insulation for Giffnock’s Victorian and Edwardian sandstone villas and terraces, built so the stone can still dry. Surveyed and designed for your wall type from build-ups already modelled for Scottish stone, with Home Energy Scotland grant funding if you qualify.
Top-floor tenement, conservation area
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Why Giffnock’s sandstone homes need vapour-open insulation
A cold Giffnock villa or terrace is expensive to heat, and the fix comes with a warning you have probably read: insulate a stone wall the wrong way and it traps damp.
-
Giffnock’s older villas and terraces are red or blonde sandstone, with solid walls and no cavity.
-
If you own one of these houses, internal wall insulation in Giffnock is one of the biggest single improvements you can make.
-
It is also the easiest one to get badly wrong.
-
The wall itself absorbs rain and indoor moisture, holds it, then releases it as vapour once conditions dry.
-
Line those walls with products made for modern brick, such as foil-faced foam boards or sealed spray foam, and that moisture gets trapped inside the stone.
-
Timber joist ends and lintels sit in damp masonry, and the problems surface years later as rot and mould.
The National Audit Office reported in October 2025 that around 98% of external and 29% of internal wall insulation installed under the ECO4 and GBIS schemes had major defects, across more than 30,000 homes.
The pattern behind those figures is generic systems fitted fast, with no thought for the wall behind them.
For a Giffnock sandstone house we fit a vapour-open system, so the rooms warm up and damp can still get out of the wall.
We strip the wall to bare stone and our lime plasterer gives it a thin coat of lime.
Our own fitters then set two layers of IndiTherm hemp, made in Scotland by IndiNature, in a timber frame and add a wood wool board.
The plasterer finishes with two coats of lime plaster, and we tell you which paints let the wall keep drying.
It is the same internal wall insulation build-up we fit in sandstone homes across East Renfrewshire and Glasgow’s Southside.
The house holds its heat while the sandstone behind the lime keeps drying.
Our process
Our simple process
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free survey and tailored design
Calum or Lewis, our surveyor, visits your home and checks how the walls are built and whether damp is already there. We also talk through what you want from the house. You get a written quote for a system matched to your walls, often with more than one option and the honest case for each.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural layers that let damp escape
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + Water vapour passes through and dries off
- + Mostly reversible, and the stone stays sound
- + Right for most solid sandstone walls
- − Costs more, takes longer, more prep
- − Slightly more room lost to depth
-
On the right wall
Sealed membrane system
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For painted or rendered brick, or dense brick that resists water
- + Can be thinner in some cases
- − Only fitted where modelling shows no damp risk
- − Wrong on a typical absorbent sandstone wall
-
-
Step 3
Specialist installation
Our six employed installers, all trained on heritage systems, carry out the work with the lime plasterer alongside them. Lime takes longer than dry-lining because of the preparation and the curing time between coats, and we plan the programme around that. Where cornicing or period joinery sits on an external wall, it is removed and recreated after the insulation goes in, with cornicing done in lime. At the survey we agree exactly who does that work.
-
Step 4
Aftercare and guarantee
You receive photographs of the completed work, guidance on paints and ventilation, and a 25-year workmanship guarantee. If anything needs attention afterwards, you call us and we come back.
-
Our line in the sand
What we will not do
Sealed foam on solid sandstone
We won’t bond a sealed polystyrene or foam board to a solid sandstone wall to meet a budget. If that’s what it would take to land a cheaper number, we’ll tell you honestly and recommend against it.
Next step
See what your sandstone needs, with the price in writing.
Bring your cornicing and room-depth questions, and get answers measured in your own rooms.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
A system designed for your wall, not pulled off a shelf.
We match each build-up to how your wall is made and how it handles water. A typical heritage install covers the six points below.
-
Moisture safety checked before we fit.
We check every proposed build-up against a library of WUFI moisture models validated for Scottish wall types, so the system on your quote is one modelled to stay dry in a west of Scotland climate.
-
Designed and signed off by the owner.
Lewis, our surveyor, or Calum looks over your walls. Calum then designs the system, signs off the quote and stands behind it.
-
Materials made in Scotland.
IndiTherm hemp insulation comes from IndiNature’s Scottish mill. It buffers moisture instead of trapping it, and it suits stone walls in a way polystyrene-based boards never will.
-
Proper lime plastering.
A trusted specialist lime plasterer works on every solid-wall job. The finish is two-coat lime with mesh, which keeps the whole system vapour-open through to the paint.
-
Honest options, honest pros and cons.
Not every wall wants the same answer. On rendered, low-absorption brick we may quote a vapour-closed build-up with Pro Clima Intello Plus and a plasterboard skim instead, and we will tell you plainly why, with the trade-offs of each.
-
Accredited and local.
We are TrustMark registered and PAS 2030 accredited, based in East Kilbride, and we install wall insulation across East Renfrewshire, from Giffnock and Clarkston through Netherlee, Whitecraigs, Thornliebank and Barrhead.
The honest bit: period features
Existing cornicing, shutters and panelling on the walls we insulate must be removed and cannot be saved. The cornicing is recreated in lime once the insulation is in, and at the survey we agree who does that work and who remakes the woodwork.
Internal wall insulation grants for Giffnock homeowners
The Home Energy Scotland grant covers up to 75% of the cost of solid wall insulation, capped at £7,500.
Not every household or property qualifies, so it is worth a call to HES early.
Full solid-wall projects run from £10,000 to £50,000 depending on the size of the house and how many rooms are done.
Most of our jobs land between £14,000 and £25,000.
We can tell you at survey stage whether your project fits the funding rules.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
If you qualify, the £7,500 cap leaves you paying between £6,500 and £17,500 of your own money in that band.
- In Giffnock, as in every postcode, the wall grant stays at £7,500.
- An optional interest-free loan of up to £2,500 for solid wall insulation can be added on top.
- Paying around £2,500 takes a job near £10,000, the point where 75% of the cost and the cap meet.
Eligible rural and island homes can reach a £9,000 total across the house, which makes a difference only if the job also takes in a loft or floor.
- The grant requires the work to be carried out by a TrustMark-registered installer, which we are.
- Home Energy Scotland administers the application itself, and we answer your questions along the way and provide everything HES needs from the installer’s side, including the quote in the format they ask for.
Why vapour-open, and why it matters for Scottish stone.
-
1Bare solid stone
Solid sandstone and rubble-stone walls manage water the way they always have: they absorb it and let it evaporate off both faces. No cavity, no membrane, no plastic. That works indefinitely, as long as the wall can keep drying.
-
2Foil-faced foam board
A foil-faced foam board, or sealed spray foam, fixed to the inside of the wall puts a stop to that drying. It creates a cold, sealed layer where warm internal moisture reaches the stone, condenses, and has nowhere to go. That trapped condensation is the actual mechanism behind the damp people blame on insulation.
-
3Vapour-open build-up
A vapour-open system (lime, hemp, wood wool) lets that vapour pass through instead, so a well-designed wall stays warm and keeps drying. The brand of insulation matters far less than whether someone designed the build-up to let the wall dry.
Calculated, not guessed.
Our designs are built on WUFI modelling, simulating heat and moisture moving through a build-up over several years, the time a solid wall actually needs to dry to equilibrium: roughly five years for brick, ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
A Giffnock stone wall is matched to a build-up from our validated library, one already modelled against masonry like yours. So before any work starts, we can show you the modelled moisture result.
What homeowners ask before they commit.
Not when it is designed for the wall. We use vapour-open materials and base the design on modelling of how moisture behaves, so the wall keeps drying. That is also why a vapour-open build-up needs no conventional plastic vapour barrier.
A vapour-open build-up adds some depth. How much depends on the system, on how much space we gain back when the old lath and plaster comes off, and on the depth of the lime parge, which we do not know exactly until we open up. We plan rooms on about 120mm per insulated wall, within a range of 105mm to 125mm, and talk it through room by room at survey.
At the survey we work out the depth for each room you plan to insulate.
Book Your Free Survey ↓On a solid-wall job, yes. To strip the wall back we have to remove the existing cornicing, shutters and panelling on those walls, and they cannot be saved. The cornicing is recreated in lime once the insulation is in, and at the survey we agree who does that work and who remakes the woodwork.
Usually yes. External insulation is normally unacceptable on a sandstone frontage, which is why internal vapour-open systems are the appropriate route. We have worked in conservation areas and will tell you honestly what is feasible.
Mention the listing or the conservation area when you book, so the survey covers what consent will need.
Book Your Free Survey ↓A vapour-open system protects the fabric and improves the EPC, both of which support the value of a period home. We will give you a straight view of payback for your situation.
Ballagan Farm, Strathblane
A full renovation of a two-storey farmhouse where the walls were damp from being poorly insulated. We stripped them back to the bare stone, parged them in lime, then insulated with IndiTherm hemp and wood-wool boards before finishing in lime plaster across both the sloping ceilings and the solid sandstone walls. The loft was insulated with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner preparing to install a heat pump and make the bedrooms comfortable year round. We used a vapour-permeable build-up of hemp, wood-wool board and lime plaster on the walls, paired with a vapour-closed system of PIR and Superfoil SF19+ on the sloping ceilings and dormers, plus Knauf Earthwool in the upper loft space.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period property. We installed a vapour-permeable system of 100mm Sisalwool, wood-wool board and lime plaster across four walls, including one large gable wall where the dropped ceiling was removed to create an insulated vaulted ceiling.
Belhaven Terrace Lane, Glasgow
A West End client looking to improve thermal performance across the whole home. The property was given internal wall insulation across the ground floor and room-in-roof insulation in the upstairs bedrooms. A vapour-open design for the stone walls was paired with vapour-closed insulation in the sloping ceilings, keeping the high-absorption sandstone able to dry while stopping warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
An internal wall insulation project carried out for a client of Oscar J Murray Architects as part of a whole-house renovation in Glasgow’s West End. We used IndiTherm hemp insulation on the stone walls, dormers and sloped ceilings, finished in lime plaster, with a Pro Clima Intello membrane on the sloping ceilings and Contega Solido airtightness tape around the windows.
Protected, and built to the standard the grant requires.
Every solid-wall job comes with a 25-year workmanship guarantee. We take no deposit, and payment is due on 7-day terms after the work is complete and you have seen it. If a company asks you for thousands up front, ask yourself why. We only invoice for finished work.
-
25-year workmanship guarantee
In writing, on every solid-wall job.
-
No deposit, pay after completion
No deposit, and payment is due within 7 days of completion.
-
TrustMark and PAS 2030 certified
Checked by auditors against the grant rules. Calum signs off each design and price himself.
-
Our own employed fitters
No agency labour and honest advice. We turn down work that is not right for the wall.
Internal wall insulation: your questions answered.
Straight answers on cost, damp, room loss, grants and conservation areas.
It is insulation fitted to the inside face of a solid wall, used where there is no cavity to fill. On a stone home it should be a vapour-open build-up so the wall can keep drying.
The honest range for a full solid-wall project is £10,000 to £50,000, driven by house size and how many rooms you insulate. Most of our jobs come in between £14,000 and £25,000. If you qualify for the Home Energy Scotland grant, capped at £7,500, your share in that band is £6,500 to £17,500. A £2,500 share fits a job of about £10,000, where 75% of the cost equals the cap. Your free survey produces a fixed written quote.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Done wrong, it can. Damp problems in insulated stone walls almost always trace back to vapour-closed materials, foam or foil-faced boards, sealing moisture inside the masonry. Our vapour-open hemp and lime system lets the wall release moisture as it always has, and we check every build-up against validated moisture models before we install it.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Breathable is the everyday word for a vapour-open build-up (lime, hemp and wood wool) that lets moisture pass through rather than sealing it in. It is the appropriate approach for solid stone and sandstone walls, and it needs no conventional plastic vapour barrier. We tend to say vapour-open, because it is the more accurate term.
Yes, it is what most people mean by that word. “Breathable” is the everyday term, but it has no technical definition, which is how unsuitable products get sold under it. The accurate term is vapour-open or vapour-permeable: a system that lets water vapour pass through and escape rather than trapping it against the stone.
We are straight about this: features on external walls cannot stay in place. Cornicing and mouldings are removed and recreated in lime once the insulation is in, and at the survey we agree exactly who does that work. Internal walls are untouched. Each insulated wall comes into the room by 105 to 125mm, so plan on about 120mm. You decide at the survey, room by room, whether that trade is worth it.
Many owner-occupiers can. The Home Energy Scotland grant covers up to 75% of the cost of solid wall insulation, capped at £7,500, plus an optional interest-free loan of up to £2,500 on top of that. The work must be done by a TrustMark-registered installer such as ourselves. HES runs the application and confirms eligibility, and we supply everything they need from our side.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Longer than dry-lining, and for good reason. Lime plaster needs proper preparation and curing time between coats, so a typical room takes days rather than hours, and a whole-house project runs in planned stages. You get a realistic programme with your quote, so you know what to expect before work starts.
Yes. From our East Kilbride base we install across the whole of East Renfrewshire, including Clarkston, Netherlee, Whitecraigs, Thornliebank, Newton Mearns and Barrhead, as well as Glasgow’s Southside. Travel is never a surcharge within this area, and the survey and quote are free wherever you are in it.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



