Internal Wall Insulation in Kilsyth: Warmer Rooms, No Foam Board on the Stone
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Kilsyth and the Foam Board Problem
Perhaps an installer has already offered to line your stone walls with foam board, and you’re not sure it suits an old house.
-
Internal wall insulation in Kilsyth has to warm the room and still let the wall dry out.
-
Kilsyth’s older terraces, cottages and villas are mostly buff or red sandstone, with no cavity inside.
-
Rain soaks into that stone in wet weather.
-
On dry days the water leaves again, some of it outwards and some through the plaster into the room.
-
Foil-backed plastic foam board, glued or screwed to the wall, blocks that inward drying.
-
Water then gathers behind the board, and the ends of your floor joists, which rest in the wall, can start to rot where nobody sees them.
-
Then there’s the room itself.
-
A lined wall comes about 120mm further in, and the cornices along that wall have to come down.
-
They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
When the National Audit Office reviewed wall insulation done under ECO4 and GBIS, it found major defects in about 29% of internal and 98% of external jobs, across more than 30,000 homes.
Our internal wall insulation for sandstone walls starts with thin lime on the bare stone, then two layers of Scottish hemp held in a timber frame, a board of wood wool and a two-coat lime plaster finish.
Every layer lets moisture through, so the wall keeps drying.
The trade calls that vapour-open.
Our process
Our Process for Internal Wall Insulation in Kilsyth, Survey to Final Coat
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis checks the stone from outside and the plaster from inside, looks for damp and asks which rooms matter most to you. Your written quote then sets out each lining option.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
The crew strips each outside wall back to the stone. Lime, hemp, wood wool and two lime coats follow, with drying time left between coats.
-
Step 4
Aftercare and Guarantee
At the end you receive photographs of the hidden layers, a note on lime-friendly paints and the 25-year workmanship guarantee.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
What Sets Our Internal Wall Insulation in Kilsyth Apart
Insulation planned around how your Kilsyth walls take in damp and dry out.
-
Every option priced, with its drawbacks
Your quote sets hemp and lime beside any other lining that suits the wall, and says plainly what each one gives up, from room depth to drying.
-
Outside faults found before the lining goes on
A leaking gutter or hard cement pointing pushes water into the stone. Calum or Lewis, our surveyor, looks at the outside first and tells you before anything is lined.
-
Layer designs checked for Scottish walls
We match your wall type to a library of hemp and lime layer designs, each one checked in WUFI moisture software for walls built that way.
-
Our own installers fit the hemp
We fit the hemp with our own crew, and a trusted lime plasterer lays every lime coat on our heritage jobs, starting with the thin coat on the bare stone.
-
Less profit on hemp, and we still recommend it
Hemp and lime cost us more than foam board, so our margin is thinner on these jobs. We put them forward because sandstone needs to dry.
-
On the TrustMark register
Home Energy Scotland will only fund solid wall work done by a TrustMark-registered installer. We’re on the register and accredited to PAS 2030 as well.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
The Price of Internal Wall Insulation in Kilsyth, With and Without the Grant
Lining old stone walls costs between £10,000 and £50,000, depending on how many outside walls you line and what sits behind the plaster.
Typical internal wall insulation costs fall between £14,000 and £25,000.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
Home Energy Scotland can pay as much as 75% of the cost of lining solid walls, up to a ceiling of £7,500. If your household gets the full grant, a £14,000 job drops to about £6,500, and a £25,000 one to about £17,500.
- No postcode lifts the £7,500 cap on wall work.
- You can also borrow up to £2,500 for wall work through Home Energy Scotland, interest-free.
A rural or island address lifts the cap for the whole house to £9,000, but the extra only helps if a loft or floor goes in with the walls.
- Home Energy Scotland owns the application and the final decision.
- We’re there for your questions throughout, and we send Home Energy Scotland the installer documents its solid wall grant process asks for.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Kilsyth, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Kilsyth.
Questions about damp, cornices or the grant before anyone touches your walls? Call Calum or book the free survey, and he or Lewis will go through them with you at the house.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
Should our workmanship fail, we come back and put it right.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
You pay nothing up front.
-
Payment within 7 days of completion
Your invoice follows completion, and you settle it within seven days.
Internal Wall Insulation in Kilsyth: What Sandstone Owners Ask Us
Straight answers on cost, grants, systems and coverage area.
Typical jobs run from £14,000 to £25,000, inside a full range of £10,000 to £50,000. An eligible household that receives the full £7,500 grant pays about £6,500 to £17,500.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Hemp and lime let the wall keep drying, so damp has a way out. Trouble starts behind linings that block moisture, such as foil-backed foam board, which is when internal wall insulation causes damp. Water coming in from outside has to stop too, so the survey checks gutters and pointing first.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Usually not, unless the house is listed. Work inside an unlisted house needs no planning permission. The council’s extra controls in the conservation area cover outside changes such as windows, doors and roofs. A listed building needs listed building consent before its walls are lined.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓Each lined wall comes in by about 120mm. Cornices on those walls come down and are recreated in lime afterwards. The survey measures every wall, so you know the room sizes before you agree to anything.
A Home Energy Scotland grant, once your application is accepted. Up to 75% of the cost is covered, to a maximum of £7,500 for the walls, and an interest-free loan of up to £2,500 can sit alongside it. The installer has to be TrustMark registered, and we are.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Usually one to three weeks, depending on the house size and the system. Lime needs drying time between coats, and rushing it risks cracks in the finish. Only walls facing outside get lined, so the inside walls stay as they are.
Yes, our crews come out to both from the East Kilbride base. The same hemp and lime build goes into stone houses a short drive away, where we fit internal wall insulation in Kirkintilloch.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



