Internal Wall Insulation in Knightswood for Cold, Mould-Prone Outside Walls
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Knightswood: Cold Walls, Black Mould and Which Wall You Have
If you wipe black mould off a bedroom corner every winter, the cold outside wall is the likely cause.
-
Internal wall insulation in Knightswood can warm that wall.
-
Your fair worry is that the wrong lining hides the damp and lets it carry on.
-
Knightswood’s cottages and cottage flats went up between the wars, and their walls vary.
-
Some have a cavity, which gets filled rather than lined.
-
Others are solid or can’t take cavity fill, and many carry a coat of harl or render outside.
-
The cheap way to line a wall is foil-backed plastic foam board, glued straight on.
-
Any gap behind the board lets warm, damp air reach the cold wall, so the mould keeps growing where you can’t see it.
The National Audit Office has checked how often wall insulation goes wrong.
It found major defects in around 98% of outside and 29% of inside wall insulation fitted under ECO4 and GBIS, across more than 30,000 homes.
On rendered or painted brick that takes in little rain, we usually fit Scottish hemp in a timber frame, then a Pro Clima membrane and plasterboard.
The membrane keeps damp air from the room away from the cold brick.
A wall that soaks up rain needs to dry out, so it gets our hemp and lime lining instead.
Every layer lets damp pass through and dry off, which people call breathable and the trade calls vapour-open.
Our process
Our Process for Internal Wall Insulation in Knightswood, From Wall Check to Finished Room
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis checks each outside wall, inside and out, and asks which rooms you want warmer first. Your written quote names the build for each wall, with its pros and cons.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
Our fitters take the old plaster off. On rendered brick they fit the frame, hemp, membrane and plasterboard, then skim. Where a wall needs to dry, our lime plasterer finishes it in lime.
-
Step 4
Aftercare and Guarantee
At handover you get photos of the layers taken before they were covered, advice on paint for your finish and the 25-year workmanship guarantee in writing.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Knightswood Homeowners Choose Us for Wall Insulation
Insulation planned around how your Knightswood walls take in damp and dry out.
-
We check for a cavity before anything else
Calum or Lewis, our surveyor, checks how each outside wall is built. If it has a cavity, we tell you on the day and quote cavity fill instead.
-
The build is picked wall by wall
A rendered gable and a bare brick back wall can need different builds. Both come from a library of layer designs checked in WUFI, moisture software, for Scottish walls.
-
Start with the coldest room
You don’t have to line the whole house in one go. You can start with the bedroom where the mould grows and add other rooms later.
-
The space each room gives up, in writing
Lining brings a wall about 120mm into the room. In a small bedroom that matters, so the survey measures it room by room before you decide.
-
Local crews from East Kilbride
Our crews drive over from East Kilbride, so a Knightswood survey is an ordinary booking for us. The same team lines sandstone tenement walls in Glasgow’s West End, nearer the city centre.
-
Hemp in both builds, by choice
Foam board would leave us a bigger margin. We fit hemp in both builds anyway, because it’s the right thing for the house.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
Solid Wall Insulation Grant and Prices for a Knightswood House
The hemp and lime build costs £10,000 to £50,000, and typical jobs land between £14,000 and £25,000.
How many outside walls you have, and whether an end house adds a gable, sets what internal wall insulation costs for you.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
- On a £20,000 job the grant stops at £7,500, leaving about £12,500.
On rendered brick, the membrane build usually costs £9,000 to £20,000.
Home Energy Scotland can pay up to 75% of the cost, capped at £7,500 for solid wall insulation. If you qualify, a £9,000 job gets £6,750 (75%) and leaves about £2,250 to pay.
- Applying for the solid wall insulation grant starts with a call to Home Energy Scotland.
- Home Energy Scotland runs the application, decides who qualifies and only funds TrustMark-registered installers, which we are.
- We answer your questions and send the installer paperwork it asks for.
- Home Energy Scotland also offers an interest-free loan of up to £2,500 for wall work.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Knightswood, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Knightswood.
Not sure if your Knightswood walls are solid or cavity? Ring Calum, say whether the outside is rendered or bare brick and which room gets the mould, and he’ll say what the survey will check first.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re TrustMark registered, PAS 2030 accredited and rated 5.0 on Google across more than 100 reviews.
-
25-year workmanship guarantee
You get it in writing at handover, covering every wall we line.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
We ask for nothing up front.
-
Payment within 7 days of completion
The invoice goes out once the last room is finished.
Internal Wall Insulation in Knightswood: What Owners Ask Us
Straight answers on cost, grants, systems and coverage area.
Expect £9,000 to £20,000 for the membrane build on brick. If you qualify, 75% of a £9,000 job is £6,750, leaving about £2,250, and a £20,000 job reaches the £7,500 cap, leaving about £12,500. The hemp and lime build typically costs £14,000 to £25,000.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Up to 75% of the cost from Home Energy Scotland, capped at £7,500 for wall work. You can add an interest-free loan of up to £2,500. Home Energy Scotland decides who qualifies and only funds TrustMark-registered installers, such as us.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓It warms the wall the mould grows on, so damp air has less cold surface to settle on. Cooking, showers and drying clothes still need airing. If the damp comes from a leak or cracked render, that gets fixed before any lining goes up.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓The survey checks each outside wall and tells you. A wall with a cavity that can take fill gets cavity wall insulation, which costs far less. Solid walls, and walls that can’t be filled, get lined from inside.
Yes, a single room can be lined on its own, so you can start where the mould is worst. Ask Home Energy Scotland how a part-house job affects your grant before you book.
Plan on about 120mm off each lined wall, usually between 105 and 125mm. Skirtings, sockets and radiators move forward, and window sills get deeper. We measure every room at the survey.
Usually one to three weeks for the whole job. Where a wall is finished in lime, each coat has to dry before the next goes on.
Yes, both, on the same terms. Surveys there are booked like any other in the west of Glasgow, with crews coming over from East Kilbride.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.