Internal Wall Insulation in Larbert and Stenhousemuir: The Right Lining for Each Stone Wall
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Insulating Stone Walls in Larbert When Every Quote Says Something Different
You want your stone house warmer, and every installer you ask says something different.
-
One quotes foam board, the next says hemp, and you’re left worrying which one traps damp.
-
Internal wall insulation in Larbert and Stenhousemuir goes right or wrong on one point: how your wall dries out.
-
The older villas and cottages here are solid stone right through, with no cavity in the middle.
-
Each wet spell, the stone takes on water.
-
Over the following days that water leaves as vapour, partly into your rooms.
-
Foil-backed plastic foam board seals the inside face of the wall.
-
The water then stays in the cold stone behind it, out of sight, and can soak into the floor joist ends built into the wall. You may only find out when mould spots the new plaster.
-
The new lining also eats about 120mm of floor along each outside wall, and any cornices or mouldings on those walls are taken down first.
-
They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
The National Audit Office put numbers on bad wall insulation in October 2025.
Across ECO4 and GBIS installs, about 29% of internal wall jobs and 98% of external ones had major defects.
More than 30,000 homes were involved.
A thin lime coat goes straight onto the stone.
Hemp slabs held in a timber frame go over it, then wood wool board and lime plaster, the build behind our internal wall insulation designed for stone.
Our linings let water vapour pass through, which the trade calls vapour-open.
Our process
How We Fit Internal Wall Insulation in Larbert: Our Process, First Look to Last Lime Coat
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis checks each wall from inside and outside, notes any damp or old repairs, and asks how you use each room. Calum signs off the written options before they reach you.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
We strip each outside wall back to the stone, then build up the lime coat, hemp, wood wool board and plaster. Every lime coat dries before the next goes on.
-
Step 4
Aftercare and Guarantee
Each layer is photographed before the plaster hides it, so you keep a record. At handover we explain which paints suit lime and hand over your 25-year workmanship guarantee.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
What Owners of Older Stone Houses in Larbert Get When They Choose Us
Insulation planned around how your Larbert and Stenhousemuir walls take in damp and dry out.
-
Our pick for each wall, downsides included
Your quote names the lining for each wall, with what you give up and what you gain. If a wall is better left alone, the quote says so.
-
Cement pointing and render noted at the survey
Hard cement on the outside slows how fast stone dries. Calum or Lewis, our surveyor, records it before choosing what goes inside, because it changes the right lining.
-
Layer designs checked in moisture software
We pick from designs already worked out for each common Scottish wall type. Each one carries a WUFI check, the software used to model how damp moves through a wall.
-
Hemp made in Scotland by IndiNature
Our main insulation is IndiTherm hemp from IndiNature. Hemp soaks up moisture and lets it go again, so it suits a stone wall that has to dry.
-
The dearer build, on a thinner margin
Our stone build costs more than foam board, and we keep less of the price as profit. Calum still steers stone-house owners to it, since foam board can trap the damp.
-
Registered for the solid wall grant
The solid wall grant needs a TrustMark-registered installer on the job. We’re registered, and our PAS 2030 accreditation covers how we fit it.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
Internal Wall Insulation Cost in Larbert and the Solid Wall Grant
Expect £10,000 to £50,000 for lining stone walls, with typical jobs at £14,000 to £25,000.
Two things push the internal wall insulation cost up or down: how many walls face outside, and the state of the stone underneath.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- InstallerTrustMark-registered
Home Energy Scotland pays up to 75% of the cost of solid wall insulation, capped at £7,500. With the full grant, a £14,000 job comes down to roughly £6,500 for you, and a £25,000 job to roughly £17,500.
- Wall work stays capped at £7,500 in every postcode.
- Borrowing is possible too: up to £2,500 for wall work, interest-free, through Home Energy Scotland.
Rural and island homes can have a £9,000 cap on the whole house, which only helps if a loft or floor goes in with the walls.
- The application itself is run by Home Energy Scotland, which decides who qualifies.
- It only pays out when the installer is TrustMark registered, as we are.
- Along the way we answer your questions and supply whatever installer paperwork it requests.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Larbert and Stenhousemuir, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Larbert and Stenhousemuir.
Already stripped the plaster in a Larbert or Stenhousemuir renovation? Leave the bare stone as it is, and it gets checked on the free survey, together with the outside of the house.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
You receive it in writing alongside your handover photos.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
Not a penny is due before completion.
-
Payment on 7-day terms
Once the job is complete, the invoice is due within 7 days.
Internal Wall Insulation in Larbert and Stenhousemuir: Questions From Stone-House Owners
Straight answers on cost, grants, systems and coverage area.
Typical stone houses come in at £14,000 to £25,000, with smaller jobs from £10,000 and the biggest up to £50,000. With the full £7,500 grant, that typical band falls to about £6,500 to £17,500.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Not with a lining that lets the stone dry. The trouble linking internal wall insulation and damp comes from sealed foam board fitted against stone, a product we don’t use on stone walls.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Yes, as long as Home Energy Scotland approves you. It funds as much as 75% of the cost, up to £7,500, and only funds work by a TrustMark-registered installer like us. Home Energy Scotland handles the application, and we supply the installer paperwork.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Plan on about 120mm off each lined wall. The finished build sits 105mm to 125mm in front of the stone, and window reveals get deeper by the same amount. Lime, hemp, board and plaster each add their share of the internal wall insulation thickness.
On an outside wall it comes down, then goes back up in lime after the insulation is finished. Who runs the new cornice is agreed at your survey.
It depends on the house and how many rooms are being lined, so raise it at your survey. Lining usually takes one to three weeks, because every lime coat needs to be dry before another can follow.
Yes. Surveys and crews travel out from our East Kilbride base, and we also take on stone wall insulation in Falkirk, a few miles away.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



