Internal Wall Insulation in Maryhill for the Cold Outside Walls of Sandstone Tenements
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Sandstone in Maryhill: Cold Walls and the Damp Question
Your flat has thick stone walls, and the front room still loses its heat by evening.
-
When you look into internal wall insulation in Maryhill, two worries come up first: trapping damp in the stone, and losing the cornicing.
-
Maryhill’s older streets have rows of sandstone tenements, and their outside walls are solid, with no cavity to fill.
-
A flat can have one cold wall or three: the street wall, the back-court wall and, at the end of a block, the gable.
-
Sandstone takes in rain and gives it back, some to the outside air and some into your room.
-
A lining on the inside has to leave that second route open.
-
Block it, and the stone stays wet for longer.
-
The cheap job glues foil-backed plastic foam board to the stone.
-
The joists under your floor rest in that same wall, so if damp gathers behind the board, their ends sit in it and can rot where nobody sees.
You’re right to be wary of a rushed job.
The National Audit Office found major defects in around 29% of internal and 98% of external wall insulation fitted under the ECO4 and GBIS schemes, in more than 30,000 homes.
On Maryhill sandstone we fit hemp and lime wall insulation. Lime goes on the bare stone first, then hemp held in a timber frame, a wood wool board and a lime plaster finish.
Damp can pass through every one of those layers.
Builders call that vapour-open, or breathable.
Our process
Our Process for Internal Wall Insulation in Maryhill, One Flat at a Time
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis checks each outside wall for damp, paint and render, and asks how you use each room. Your written quote sets out every option, with its price and its drawbacks.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
The crew takes each wall back to the stone, then our lime plasterer puts on the first thin coat. After that come the frame, hemp, wood wool board and lime plaster, each coat left to dry. Jobs usually take one to three weeks.
-
Step 4
Aftercare and Guarantee
Once the plaster is dry, you get photos of the layers now hidden behind it, advice on paints that suit lime and the 25-year workmanship guarantee in writing.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Maryhill Owners of Sandstone Flats Choose Us
Insulation planned around how your Maryhill walls take in damp and dry out.
-
Every outside wall checked before a price
Calum or Lewis, our surveyor, looks at each cold wall from inside and out. Paint or cement render on the stone slows drying, so it goes in the survey notes before Calum prices anything.
-
Street, back-court and gable walls matched separately
Those walls don’t always face the same weather or share the same stone. We match each one to a library of layer designs checked in WUFI moisture software for Scottish walls.
-
Room depth worked out wall by wall
Each lined wall comes about 120mm into the room. In a small kitchen or box room that counts, so you pick which walls to line after seeing the figures.
-
Hemp costs us more, and we fit it anyway
Foam board is cheaper and faster to put up, and it would leave us a bigger margin. On sandstone we still choose hemp and lime, because the stone has to keep drying.
-
A short drive across Glasgow from East Kilbride
Our crews work right across the city from East Kilbride, 20 to 30 minutes away. We fit the same lining in the sandstone tenements of Hyndland, Dowanhill and Kelvinside nearby.
-
On the register Home Energy Scotland funds
Home Energy Scotland pays solid wall grants only for work by a TrustMark-registered installer. We’re on that register and accredited to PAS 2030.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
Internal Wall Insulation Cost in Maryhill and the £7,500 Grant
Lining solid sandstone costs £10,000 to £50,000, depending on how many outside walls you line and what the stone is like under the old plaster.
Typical jobs land between £14,000 and £25,000.
A flat with one cold wall usually sits nearer the bottom of the internal wall insulation cost range than an end flat with three.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
Home Energy Scotland (HES) can fund up to 75% of solid wall insulation, with a £7,500 limit. At the full amount, a £25,000 job leaves about £17,500 for you and a £14,000 job about £6,500.
HES also lends up to £2,500 interest-free for solid wall work, and it runs each application and rules on who qualifies.
- Our job is to answer your questions and hand HES the installer’s paperwork.
Above £10,000 the £7,500 cap sets your grant, so how the solid wall grant is calculated matters before you compare quotes.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Maryhill, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Maryhill.
Ring Calum, tell him which rooms in your Maryhill flat feel coldest and whether the flat sits at the end of the block, and he’ll say which walls the survey should look at.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re TrustMark registered, PAS 2030 accredited and rated 5.0 on Google across more than 100 reviews.
-
25-year workmanship guarantee
If our workmanship fails, we return and put it right.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
Nothing leaves your account before the crew starts.
-
Payment on 7-day terms
You pay within seven days of completion, once you have seen the finished walls.
Internal Wall Insulation in Maryhill: Questions From Flat Owners
Straight answers on cost, grants, systems and coverage area.
Expect £14,000 to £25,000 for a typical flat. If you qualify for the full £7,500 grant, about £6,500 to £17,500 is left for you to pay.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Yes, if your household qualifies. HES pays up to 75% of the cost, capped at £7,500 for solid wall work, and you can add an interest-free loan of up to £2,500. It only funds TrustMark-registered installers, and we are one.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓It shouldn’t, if every layer lets moisture through. Foam board sealed against sandstone holds the damp in, so we leave it off stone walls. If a wall is already damp, from a leaking gutter or a cracked downpipe for example, the survey traces the cause first.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Yes. The lining goes on the inside of your own outside walls. The close, the stair and the stonework outside stay as they are, which is why tenement wall insulation can go ahead one flat at a time.
On a lined outside wall, it comes down. It is recreated in lime once the insulation is in, and at the survey we agree exactly who does that work. Cornicing on inside walls stays where it is.
Usually, yes: one to three weeks. Each lime coat dries before the next goes on, so the work runs in stages, and your quote comes with the dates.
That depends on how it was built, so the survey comes first. Later homes in the area are usually built with a cavity or by other modern methods, not in solid sandstone. Calum or Lewis checks your walls and tells you which route suits them.
Yes, both. Our crews work across Glasgow from East Kilbride, and every job starts with a survey by Calum or Lewis.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



