Internal Wall Insulation in Melrose: Warm Rooms, Walls That Still Dry Out
Your free survey shows which walls of your Melrose house gain most from internal wall insulation, and what each one would cost.
Insulation
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Melrose Without Trapping Damp in the Stone
A cold stone house is miserable in winter.
-
The fear with internal wall insulation in Melrose is trading cold for damp.
-
Water stays in the stone, mould grows behind the wardrobe and timber rots where the floor meets the wall.
-
That fear has good grounds.
-
Some older Melrose houses have harl, a coat of lime or cement render, on the outside. A cement harl holds water in the stone, so the wall does much of its drying into the room instead.
-
Glue foil-backed plastic foam board inside that wall and you close its last way out.
-
The water builds up where you can’t see it, then shows as damp along the skirtings.
-
You may also be worried about the cornicing, or how much floor space the lining eats.
-
On a wall we line, the cornice comes down and gets remade in lime, and the room loses about 120mm on that side.
A National Audit Office report on the ECO4 and GBIS government schemes, out in October 2025, found major defects in around 98% of external and 29% of internal wall insulation.
The faults sit in more than 30,000 homes.
Lime, hemp and wood wool let us give you both, a warm house and sound stone.
Every layer we put on the wall lets water vapour through, from the lime on the stone to the hemp and the lime plaster on top.
That is the only way we fit internal wall insulation on stone and harled houses.
A Borders winter stays outside, and the stone behind the lime keeps drying.
Our process
Our Internal Wall Insulation Process in Melrose, From Survey to Handover
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
At the survey, Calum or Lewis (our surveyor) checks the stone, the harl and any signs of damp. Calum then matches your wall to a set of layers from our library and puts his reasons in the written quote.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
We take the wall back to bare stone and our lime plasterer gives it a thin coat of lime. Next our own fitters put two layers of hemp in a timber frame and fix a wood wool board over them. The plasterer then finishes the wall in two coats of lime plaster, and each one dries before the next goes on.
-
Step 4
Aftercare and Guarantee
Before each layer disappears behind the next, we take photos for your records. At handover you get the written 25-year workmanship guarantee and advice on paints that won’t seal the lime.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Next step
Your first step
See what lining your Melrose house would cost, and how much room it takes.
Calum or Lewis tells you on the day whether your harl is lime or cement, and what that means for the wall behind it.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Melrose Homeowners Choose Us for Internal Wall Insulation
Insulation planned around how your Melrose walls take in damp and dry out.
-
We check the listing before we quote
A listed house needs council consent for some work inside, and we tell you what yours would involve.
-
We look at the harl from the street first
We note whether it’s lime or cement, sound or cracked, because that changes how well the wall can dry to the outside.
-
Scottish hemp, even though foam board is cheaper
IndiTherm hemp from IndiNature, made in Scotland, costs more than foam board. It suits stone, so it’s what we fit.
-
Rough stone and cut stone get their own layers
Our library covers Scottish wall types, rubble and cut sandstone included, with the right layers for each. We’ve checked every set in WUFI, a computer model of how moisture travels through a wall.
-
Two prices where both options fit
A later brick extension can take hemp, a moisture-control sheet and plasterboard instead. If either would work, you see the two costs side by side, with the pros and cons.
-
A long drive, planned in advance
We come down from our East Kilbride base, and the same heritage installers and lime plasterer work on Melrose jobs as on every other.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, the plaster mouldings are recreated in lime, and at the survey we agree who does that work and who remakes the woodwork.
Internal Wall Insulation Cost in Melrose and the Home Energy Scotland Grant
Internal wall insulation on a Melrose stone or harled house costs £10,000 to £50,000, and most of our heritage jobs land in the £14,000 to £25,000 bracket.
Jobs that need a retrofit coordinator get a qualified external one under PAS 2035.
We also survey in Darnick, Gattonside and Newstead, and further north we fit internal wall insulation in Dalkeith and the rest of Midlothian.
Some inside work on a listed Melrose house needs council consent, and we check that before we quote.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
With the full £7,500 from Home Energy Scotland, a £14,000 job leaves you about £6,500 to find and a £25,000 job about £17,500.
- For solid wall insulation, the grant funds up to 75% of the bill, with a cap of £7,500 that holds in every postcode.
- You can also borrow up to £2,500 interest-free through an optional Home Energy Scotland loan.
If Home Energy Scotland treats your address as rural, the cap for the whole house rises by £1,500 to £9,000, and that extra only helps if a loft or floor goes in with the walls.
- Home Energy Scotland runs the application and decides who qualifies.
- You also need a TrustMark-registered installer for the grant, and we are one.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Melrose, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
Your wall is matched to a set of layers we have already modelled, so we can show you the modelled damp result for a wall like yours on paper.
Ask your own questions about internal wall insulation in Melrose.
Not sure if your Melrose house is listed, or whether its harl is lime or cement? Ask Calum when you book, and the survey answers both.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
If anything in our workmanship fails inside 25 years, we come back and fix it.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
You pay nothing until the work is done.
-
Payment on 7-day terms
Once the job’s finished and you’ve looked it over, we send the invoice and you have seven days to pay.
Internal Wall Insulation in Melrose: Questions Homeowners Ask
Straight answers on cost, grants, systems and coverage area.
Yes, in many cases, once you have listed building consent. Lining an outside wall can change a listed building’s character. You apply to Scottish Borders Council, and our written specification shows what the lining involves.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓No, as long as each layer on the inside lets moisture out of the stone. The trouble comes from foil-backed foam board on stone that dries inward, and a cement harl makes it worse. Keep every layer open and a harled house like yours stays dry, which answers whether internal wall insulation causes damp here.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓In most cases, yes. A detached villa has four outside walls to line, while a house in the centre often shares one or both side walls with neighbours. That wall count moves internal wall insulation costs more than anything else in a Melrose quote.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓That’s Home Energy Scotland’s decision, made on your exact postcode. Even a rural postcode leaves the walls at £7,500. The higher £9,000 cap covers the whole house, so it only matters if you also insulate the loft or floor. The grant still pays up to 75% of the cost.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Cornicing on the walls we line comes down first. Our lime plasterer then copies the old pattern in new lime plaster. Cornicing on the walls between rooms stays put. Each lined wall comes about 105 to 125mm into the room. Allow 120mm when you measure for furniture.
Whinstone is a hard grey local stone. Both it and sandstone suit a lining that lets damp escape, harled or bare, and we fit vapour-open internal wall insulation on both. The other route, plasterboard over a moisture-control sheet, suits later brick.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.



