Internal Wall Insulation Peebles for Older Stone Houses
On top of any Home Energy Scotland grant, Peebles households can apply for an interest-free loan of up to £2,500 towards internal wall insulation.
Insulation
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation Peebles: Will It Hold Damp in the Stone?
Your solid stone walls in Peebles feel cold, and lining them looks like the obvious fix.
Some older Peebles houses pair whinstone, a hard grey local stone, with sandstone round the windows. The two stones take up water differently.
-
The worry with internal wall insulation in Peebles is what happens behind the lining.
-
Could it keep damp locked in the stone until the joist ends and skirtings go soft?
-
Old stone walls stay sound because the rain that soaks in can dry out again. Foil-backed plastic foam board glued on the inside blocks that drying. The water stays in the stone and comes back as mould, damp patches or soft timber.
-
If the insulation stops short at the sides of a window, a cold strip is left where condensation and black mould start.
In October 2025 the National Audit Office reported on the ECO4 and GBIS government schemes.
It found major defects in around 98% of the external and 29% of the internal wall insulation they paid for, across more than 30,000 homes.
Grant rules trip people up as well. If you qualify, Home Energy Scotland pays up to three quarters of the cost, with a £7,500 limit on wall work. We work out the figures for your house when we quote.
You’re right to be wary of a quick job.
You need warmth in those rooms, with the stone left to dry as it always has, and that is what we build.
We line the wall with layers that let damp pass through.
There’s no foil-backed board in it, so the drying that keeps the stone sound carries on.
The trade calls this vapour-open, and it is the internal wall insulation we fit on stone houses across central Scotland.
Every layer we add in Peebles lets the stone dry, so the warmth you gain costs the wall nothing.
Our process
Our Process in Peebles, From Survey to Finished Wall
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free survey and tailored design
Calum or Lewis, our surveyor, checks each outside wall, any harl (the render on the outside), the stone round the windows and any old damp. Calum picks the layers, and the written quote explains why.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist installation
Our installers strip the old plaster off, build the frame, fit the hemp and fix the board. Our lime plasterer puts on the first lime coat and the finish, and we wait for each coat to dry before starting the next.
-
Step 4
Aftercare and guarantee
You get paint advice for the new lime finish and the workmanship guarantee in writing at handover.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Next step
Get a written price for your Peebles walls, window reveals included.
Bring your questions about damp by the windows, cornicing and the grant, and get a straight answer to each in your own rooms.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Owners of Older Peebles Houses Choose Us
Insulation planned around how your Peebles walls take in damp and dry out.
-
We carry the insulation round each window
We check each window and door, the stone round it and how deep the opening is. The insulation turns into the sides of the opening, so no cold strip is left and the window frame isn’t buried.
-
Scottish hemp and lime on the stone
Over the lime coat we fit two 50mm layers of IndiTherm hemp, made in Scotland by IndiNature, pressed into a timber frame. Wood wool board and two lime plaster coats finish it. Hemp lets the wall dry where foam board would seal it, which settles the hemp versus foam board question on solid stone.
-
Layers checked for Scottish walls
WUFI is software that predicts where damp will go inside a wall. We match your wall to a library of layer combinations checked with it, so whinstone and a later brick wall can get different answers.
-
Two options, both priced
A later solid brick extension, where the brick soaks up little water, can take hemp behind a damp-control membrane (Pro Clima Intello Plus), then plasterboard. Where both routes work, the quote prices each one with its pros and cons.
-
Photos of every hidden layer
We photograph each layer before it is covered and hand the pictures over. You keep a record of what sits behind the plaster.
-
Room depth for each room, in writing
The lining brings each wall 105 to 125mm further into the room. Plan on 120mm. You get the figure for each room from the survey.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, the plaster mouldings are recreated in lime, and we agree at the survey who remakes the woodwork.
Internal Wall Insulation Peebles Prices and Wall Insulation Grants
Heritage quotes run from £10,000 to £50,000, and most fall between £14,000 and £25,000.
Peebles is further out than our Glasgow work, so we fix survey dates in advance and our crews travel to you.
Nearer Edinburgh, our crews cover internal wall insulation in Dalkeith and the rest of Midlothian.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
If you get the full £7,500 grant, you’d pay about £6,500 on a £14,000 job and £17,500 on a £25,000 one.
On a £14,000 Peebles job, a full £7,500 grant leaves about £6,500 for you to fund.
- If you qualify, Home Energy Scotland pays up to 75% of the cost of solid wall insulation, capped at £7,500 for the walls in any postcode.
- You can add an optional interest-free loan of up to £2,500.
A rural or island postcode lifts the limit for the whole house to £9,000, which only helps if you insulate your walls and another part of the house.
- Funding needs a TrustMark-registered installer, and we are one.
- Home Energy Scotland decides who qualifies, and at survey we answer your questions about the solid wall insulation grant.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Peebles, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. A larger, listed or unusual building gets a closer look at survey before we choose from that set. Either way, we can show you the modelled damp result for a wall like yours.
Ask your own questions about internal wall insulation in Peebles.
Got a damp patch by a window, or a cornice you’d hate to lose? Calum or Lewis looks at both on the survey of your Peebles house.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
-
25-year workmanship guarantee
It comes in writing, and if our workmanship fails within that time we fix it at our cost.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
You pay nothing up front.
-
Payment on 7-day terms
The invoice comes after completion, once you’ve checked the finished walls.
Internal Wall Insulation Peebles: Questions From Homeowners
Straight answers on cost, grants, systems and coverage area.
Not when every layer lets damp pass. Damp comes from foil-backed foam board or plastic sheeting fixed to stone, which traps moisture behind the new wall. That sealed layer is where the link between internal wall insulation and damp comes from.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Plan on £14,000 to £25,000. A full grant brings that down to about £6,500 to £17,500. The number of outside walls, their condition and any cornice work set your figure.
Home Energy Scotland decides that by postcode. A rural postcode doesn’t raise the £7,500 limit on wall work. It lifts the cap for the whole house to £9,000, so the extra £1,500 can only go on another measure, such as loft or underfloor insulation. Either way, if you qualify, the grant covers up to 75% of the cost.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Often yes, but you need listed building consent from Scottish Borders Council first when the work affects the building’s character. A house that isn’t listed generally needs no planning permission for work inside.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓The cornice on a lined wall has to come down, because the new layers replace the old plaster. It is recreated in lime to match the old shape, and at the survey we agree exactly who does that work.
The lime sets the pace. Each lime coat has to dry before the next stage starts, so your quote gives the timetable once we’ve surveyed.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.