Internal Wall Insulation in Portobello: Warm Rooms Behind Sandstone That Takes the Sea Weather
Survey and advice
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Portobello When the Wall Already Takes a Soaking
You want the front room warm without a wet wall hiding behind new plaster.
-
Internal wall insulation in Portobello can give you both, if the lining lets the stone dry.
-
Portobello’s older villas, terraces and tenements are mostly solid blonde or red sandstone, with no cavity.
-
Houses near the Promenade take wind and rain straight off the Firth of Forth, so their stone gets wetter and has more water to lose.
-
Sandstone gives that water up through its lime mortar and plaster.
-
Glue foil-backed plastic foam board over it and the inside face can’t dry.
-
Damp then works along to the floor joists built into the stone, and rot can start in timber you never see.
The National Audit Office checked wall insulation fitted under the ECO4 and GBIS schemes.
It found major defects in around 98% of outside jobs and 29% of inside jobs, across more than 30,000 homes.
A lined wall also moves about 120mm into the room, and cornicing and mouldings on it come down.
They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
Lime goes straight onto the stone, then Scottish hemp in a timber frame, wood wool board and lime plaster. It’s the build behind our internal wall insulation for solid stone, and every layer lets moisture through.
For sandstone we fit layers that let damp out (the trade word is vapour-open).
Our process
Our Internal Wall Insulation Process in Portobello, From Bare Stone to Lime Plaster
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis looks at every outside wall from indoors and from the street, and asks how you use each room. The written quote sets out each option’s pros and cons.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
Our installers strip the wall to stone and our lime plasterer lays the first coat. Frame, hemp and wood wool follow, then two coats of lime plaster, each left to dry.
-
Step 4
Aftercare and Guarantee
You get photos of the layers hidden behind the plaster, a list of paints that suit lime and the 25-year workmanship guarantee in writing.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Portobello Households Choose Us for Their Stone Walls
Insulation planned around how your Portobello walls take in damp and dry out.
-
Weather exposure checked wall by wall
Calum or Lewis, our surveyor, notes which walls take the wind off the Firth, and your quote says how each of those walls is lined.
-
Outside faults flagged before any lining
Patchy cement render on a gable or a dripping downpipe keeps stone wet. We point it out at the survey, so you can have it put right first.
-
Tested layer designs for Scottish stone
We choose your lining from layer designs already tested for Scottish stone, each checked for damp in WUFI moisture software.
-
Hemp and lime, even on a thinner margin
Hemp and lime cost more than foam board, so we earn less on every hemp job. We still recommend them, because sandstone has to dry.
-
Surveys booked in, crews travel east
Portobello sits on the far side of Edinburgh from our East Kilbride base. We fix survey and fitting dates ahead, as we do when lining stone walls elsewhere in Edinburgh.
-
On the register the grant pays through
Home Energy Scotland funds solid wall insulation only when a TrustMark-registered installer fits it. We’re registered and PAS 2030 accredited.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
Internal Wall Insulation Cost in Portobello and the £7,500 Grant Cap
A typical Portobello stone wall job costs £14,000 to £25,000.
The full range runs from about £10,000 to £50,000, and internal wall insulation costs climb with every extra outside wall and every surprise found behind old plaster.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- InstallerTrustMark-registered
Knock the full £7,500 off and a £14,000 job comes down to about £6,500, while a £25,000 job comes down to about £17,500.
- Home Energy Scotland (HES) pays up to 75% of the cost, capped at £7,500 for solid wall insulation.
- Wall work stops at £7,500 wherever you live.
A rural or island address has a £9,000 cap for the whole house, and that higher figure only comes into play when a loft or floor is part of the same job.
- HES runs the application and decides who qualifies.
- We answer your questions and send the installer paperwork it needs, and it only pays out when a TrustMark-registered installer does the work.
- HES can also lend up to £2,500 interest-free for solid wall work.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Portobello, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Portobello.
Not sure whether your gable is bare stone, painted or patched with cement? Calum or Lewis checks it on the free survey and tells you which lining that wall can take.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re TrustMark registered, PAS 2030 accredited and rated 5.0 on Google across more than 100 reviews.
-
25-year workmanship guarantee
If anything we fitted fails through our workmanship, we return and repair it.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
We ask for no money before the lining goes in.
-
Payment within 7 days of completion
We invoice once the work is complete, and you have seven days to settle it.
What Portobello Homeowners Ask Before Insulating a Stone Wall
Straight answers on cost, grants, systems and coverage area.
Typical jobs run from £14,000 to £25,000. With the full £7,500 grant, that drops to about £6,500 to £17,500. The widest range is £10,000 for a small job up to £50,000 for a large villa.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Yes, if your household qualifies. HES pays up to 75%, capped at £7,500 for solid wall work, and can lend up to £2,500 interest-free. Only work by a TrustMark-registered installer qualifies, and we are on that register.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Not with hemp and lime, which we choose for that reason. Those layers let water vapour pass, so the stone keeps drying. A wall that takes heavy weather also needs sound pointing and working gutters, and the survey checks both.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Yes, from inside your own flat. We line the outside walls of your rooms, and the street face and the stair stay as they are. The same hemp and lime build suits tenement wall insulation in red or blonde sandstone.
Yes, a listed building needs listed building consent from the City of Edinburgh Council first. An unlisted house needs no planning permission for work inside, even within a conservation area.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓Plan on about 120mm per lined wall, usually 105 to 125mm. Cornicing and mouldings on that wall come down. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
Usually one to three weeks. Each lime coat needs days to dry before the next goes on, so we plan the programme around the drying and give you the dates before we start.
Yes, all three, on the same booked-in survey and fitting days. A little further east, we also insulate stone walls in Musselburgh.