Solid Stone Walls in Stockbridge: Two House Types, One Damp Risk
If you’re weighing up internal wall insulation in Stockbridge, your first question is likely whether lining the walls will trap damp in the stone.
-
With the wrong board, it can.
-
The second worry depends on the house.
-
In a Georgian terrace it’s the shutters and deep cornicing.
-
In a colony flat, where rooms are smaller, it’s the 120mm or so that each lined wall takes back from the room.
-
Both sit behind solid stone with no cavity.
-
After rain the stone holds some water and later lets it go, partly outwards and partly into the room.
-
Seal the inside face and the wall can only dry one way, so it stays wetter for longer.
-
The quick, cheap version is a foil-backed plastic foam board glued straight onto stone. Damp then gathers behind the board and around the floor joists built into the wall, and the timber can soften long before anyone sees a mark.
National Audit Office figures put numbers on bad wall insulation.
Under the ECO4 and GBIS schemes, around 98% of external and 29% of internal wall jobs had major defects, in over 30,000 homes.
On stone we fit hemp and lime internal wall insulation. The bare stone gets a thin coat of lime, then two layers of Scottish hemp go into a timber frame, under wood wool board and lime plaster.
Every layer lets damp pass through, which is what the trade calls vapour-open.
Our process
Our Process for Internal Wall Insulation in Stockbridge, Room by Room
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
At the survey, Calum or Lewis looks at the stone, any paint or render outside and any damp patches inside. The written quote lists each option side by side, with its price and its downside.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
The crew strips back to stone and our lime plasterer puts on the first thin coat. Next come the timber frame, the hemp and the wood wool board, then lime plaster, with drying time between coats.
-
Step 4
Aftercare and Guarantee
Once the plaster has dried, you get photos taken before each layer was covered, advice on which paints work over lime, and the 25-year workmanship guarantee.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Stockbridge Owners of Stone Homes Choose Us
Insulation planned around how your Stockbridge walls take in damp and dry out.
-
Room depth measured before you decide
Calum or Lewis, our surveyor, measures each outside wall and window reveal. You see what the lining takes from every room before choosing which walls to do.
-
Mouldings come down and go back in lime
Cornicing and plaster mouldings on an outside wall have to come off for the work. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
-
Layer designs matched to your stone
We match each wall to a library of WUFI-checked layer designs for Scottish walls.
-
Hemp earns us less, and we fit it
Foam board would be quicker and leave us more margin. On solid stone we fit hemp and lime regardless, because the wall has to keep drying.
-
Survey dates and lime coats booked ahead
Stockbridge is about an hour from our East Kilbride base, so surveys and plastering visits go in the diary early. Crews travel through on agreed dates, as they do for stone wall insulation across the rest of Edinburgh.
-
Registered so the grant stays open to you
Home Energy Scotland pays solid wall grants only for work by a TrustMark-registered installer. We’re on that register and accredited to PAS 2030.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
Internal Wall Insulation Cost and Grant in Stockbridge
Lining solid stone walls costs £10,000 to £50,000, and the usual range is £14,000 to £25,000.
A colony flat with one cold gable sits near the bottom of the internal wall insulation cost range, and a terrace house with several outside walls nearer the top.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
On a £14,000 lining, the full grant leaves roughly £6,500 for you, and on a £25,000 one roughly £17,500.
The 75% and the £7,500 cap apply together, so on any solid wall insulation grant claim for more than £10,000 of work, the cap is the figure that counts.
- If you qualify, Home Energy Scotland pays up to 75% of the cost of solid wall insulation, capped at £7,500.
- You can add an interest-free loan, capped at £2,500 for solid wall work.
- The application goes through HES, and HES decides who qualifies.
- We answer anything you ask along the way and provide the installer documents HES requires.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Stockbridge, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Stockbridge.
Call Calum with the rough age of your Stockbridge home and which walls feel coldest, and he’ll tell you what the survey will look at.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re TrustMark registered, PAS 2030 accredited and rated 5.0 on Google across more than 100 reviews.
-
25-year workmanship guarantee
You get it in writing at handover.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
Nothing is paid before the work starts.
-
Payment on 7-day terms
The invoice goes out at completion and is due within seven days.
Internal Wall Insulation for Stockbridge Stone: Your Questions
Straight answers on cost, grants, systems and coverage area.
Expect £14,000 to £25,000 for a typical job. With the full £7,500 grant, your share would be around £6,500 to £17,500.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Not with materials that let damp out. Hemp, wood wool and lime let the stone keep drying. Foam board stuck to stone is what traps damp, and we don’t fit it on solid stone walls. If a wall already shows damp, the survey looks for the cause first.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓It can be, if you choose the walls with care. Each lined wall comes in by around 120mm, so the survey measures every room and you decide which outside walls to do.
Yes, if the building is listed: lining its walls needs listed building consent. Insulating a listed building in Scotland starts with that application to the council. An unlisted house in a conservation area needs no planning permission for internal work.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓On outside walls they come off for the work. Cornicing is recreated in lime once the insulation is in, and at the survey we agree exactly who does that work and who remakes the shutters.
Expect one to three weeks. Lime has to dry between coats, so the work runs in stages.