Internal Wall Insulation in West Kilbride and Fairlie for Harled Stone Houses
For West Kilbride and Fairlie homeowners, we answer your Home Energy Scotland grant questions before any internal wall insulation goes in.
Room-in-roof, loft and underfloor insulation
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Will Internal Wall Insulation in West Kilbride Trap Damp in Your Stone?
Your stone house is cold, and you want it warm without harming the walls.
-
Many houses here were extended over the years, so some have old stone at the front and brick at the back.
-
Fit both with the same internal wall insulation in West Kilbride or Fairlie, and one can end up damp, with mould behind the plaster.
-
Plenty of the older cottages and villas here are harled.
-
Harl is a rough lime coat, and rain that gets into the wall can dry back out through it.
-
Cement render or plastic masonry paint laid over it stops that outward drying.
-
Add foil-backed plastic foam board on the inside, the quick job many installers quote, and the wall can’t dry either way.
-
The damp sits in the stone and creeps to the ends of the floor joists, the timber beams that rest in the wall.
The National Audit Office checked wall insulation done under the government’s ECO4 and GBIS schemes.
In October 2025 it reported major defects in around 98% of outside-wall jobs and 29% of inside-wall jobs, across more than 30,000 homes.
You can have warm rooms and a wall that still dries, whatever coat is on the outside.
On stone, every layer we fit lets damp pass through, so the wall keeps drying into the room.
We match the layers to each wall, front and back, as we do on every internal wall insulation job on older stone homes.
With the right lining on each wall, your rooms get warm and the harled stone keeps drying out through the lime.
Our process
Our Process for Internal Wall Insulation in Fairlie
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free survey and tailored design
Calum or Lewis looks at the outside of the wall first, then at every room with an outside wall. You get a price for the right layers on each type of wall.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist installation
Our installers strip the wall to bare stone, and our lime plasterer covers it with a thin lime coat. The installers then fit the frame, hemp and board before he adds two coats of lime plaster. Each coat must dry before the next, so allow several weeks.
-
Step 4
Aftercare and guarantee
Once the plaster has dried, you get the photographs, advice on paints that let lime plaster dry out, and our 25-year workmanship guarantee.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Next step
Start with the survey
See what warming your harled house would take, and what it would cost.
Ask about the harl, damp near the floor joists and the grant, and get a plain answer to each.
Book Your Free Survey ↓
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Homeowners in West Kilbride and Fairlie Pick Us for Their Stone Walls
Insulation planned around how your West Kilbride walls take in damp and dry out.
-
We check the outside coat first
Calum or Lewis, our surveyor, notes whether your wall has lime harl, cement render or masonry paint. They also look for cracked render holding water and for damp low down on the inside.
-
Natural materials against the stone
On the stone front we build up from a thin lime coat to two layers of IndiTherm hemp, made in Scotland by IndiNature, with wood wool board and lime plaster over them. Damp can pass through every layer, so the wall keeps drying.
-
Wall designs already tested for Scotland
We pick from a set of wall designs checked with WUFI, computer modelling that tracks how damp moves through a wall, and match your wall to the closest one.
-
Two options when your walls differ
A brick extension behind thick render can take a sealed system with a membrane that controls damp (Pro Clima Intello Plus). Your quote then prices both systems side by side.
-
Photos of what the plaster hides
We photograph the bare stone, the lime coat, the frame and the hemp before plastering. You keep that record, and it helps if you ever sell.
-
The same terms on the coast as in Glasgow
You get the same guarantee and payment terms as a customer in Glasgow. Further up the coast, the same terms apply to internal wall insulation in Largs.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, the plaster mouldings are recreated in lime, and we agree at the survey who remakes the woodwork.
Wall Insulation Grants in West Kilbride and Fairlie, and What You Pay
Insulating old stone walls costs £10,000 to £50,000, and a typical job in West Kilbride or Fairlie comes to £14,000 to £25,000.
Stone needs a lining that lets damp escape.
Brick that soaks up little water can take one that keeps room damp out instead.
If your house mixes stone and brick walls, each wall gets the lining it needs and you see both prices side by side.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
- LoanOptional, interest-free, up to £2,500
- InstallerTrustMark-registered
A full £7,500 grant cuts your share to about £6,500 to £17,500.
- Home Energy Scotland (HES) offers a grant of up to 75% of the cost, capped at £7,500 per property.
- Wall work on its own stops at £7,500 in any postcode.
- An optional interest-free loan of up to £2,500 can go towards solid wall work.
A rural or island postcode lifts the whole-property cap to £9,000, which only helps if you add a loft or floor.
- The grant needs a TrustMark-registered installer, and we are registered and PAS 2030 accredited.
- HES runs the application and decides who qualifies, and at survey we answer your questions about the solid wall insulation grant in Scotland.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in West Kilbride, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. A larger, listed or unusual building gets a closer look at survey before we choose from that set. Either way, we can show you the modelled damp result for a wall like yours.
Ask your own questions about internal wall insulation in West Kilbride.
The coat on the outside of your stone decides the lining, and Calum or Lewis checks it on the survey of your house.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re rated 5.0 on Google across more than 100 reviews. Iain McFadyen had his room-in-roof, loft and underfloor done with us, and we photograph wall jobs the same way.
-
25-year workmanship guarantee
If our workmanship fails within 25 years, we come back and put it right.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
We send no bill until the job is finished.
-
Payment on 7-day terms
We invoice once the walls are done, and you have seven days to pay after you’ve seen them.
Internal Wall Insulation in West Kilbride and Fairlie: Your Questions
Straight answers on cost, grants, systems and coverage area.
It won’t if every layer lets damp pass through. Damp problems come from sealed materials such as foil-backed plastic foam board, which stop the stone drying into the room. With vapour-open internal wall insulation, every layer from the lime coat to the plaster finish lets the stone dry.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓A typical old stone wall job costs £14,000 to £25,000, within a range of £10,000 to £50,000. After the full £7,500 grant, that is about £6,500 to £17,500. The number of outside walls and the state of the stone set the price.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Yes, if HES approves your application. The grant covers up to 75% of the cost, capped at £7,500 for wall work wherever you live. An optional interest-free loan adds up to £2,500.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓In the usual case, no. Conservation-area rules cover changes people can see from the street, and this work stays inside. Listed buildings are different, because consent can cover inside work too, so check with North Ayrshire Council if your house is listed.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓Cornicing on the outside walls comes down first and is recreated in lime in the new plaster, and at the survey we agree who does that work. Inside walls keep theirs. Each insulated wall moves into the room by about 105 to 125mm, so plan on 120mm.
Expect several weeks. Stripping, framing and fitting the hemp take a few days. Each lime coat then has to dry before the next goes on, and cold, damp weather slows that down.
Book Your Free Survey.