On a standard job, loft and underfloor insulation can go in on the same day, because we send two crews at once: one works up in the loft while the other works under your ground floor. Fitted together, a standard loft and a standard suspended timber floor cost £2,400 to £4,500 installed, or £600 to £1,500 once Home Energy Scotland approves a grant for each measure.
- Two crews of our own installers split the house, one in the loft and one under the floor, so both measures go in on one visit on a standard job.
- The loft gets Knauf Earthwool laid to 300mm in two layers, and the floor gets Knauf Omnifit 40 held up on support netting between the joists.
- Home Energy Scotland caps its grant at £1,500 for each measure, so a loft and a floor together can draw up to £3,000 of the £7,500 property cap.
- After an approved grant, the standard loft and floor together leave £600 to £1,500 to pay, depending on the size of each job.
- Large floors, boarded lofts and tight crawl spaces can push the work into a second day, and the surveyor sees all three before you book.
- We work across central Scotland from East Kilbride, and the floor crew needs a suspended timber floor, because a concrete slab has no void to fill.
Booked separately, a loft and a floor mean two lots of tradespeople and two days off work. We book the pair as a single job, with a survey, a quote listing both measures and an install date, and the two crews work at opposite ends of the house.
Why loft and underfloor insulation suit one visit
Insulation fitted between the joists of a ground floor, with the boards lifted for the job.
A house loses heat at the top and at the bottom. Warm air rises through the ceiling into a cold loft, and cold air comes up between the floorboards from the ventilated void under the ground floor. Fix one end and the other keeps running cold.
The surveyor looks at the loft and goes under the floor on the same visit, and you get one written quote with both measures and their grant figures in pounds. The crews protect the hall and stairs once, and on a standard job you take one day off work.
The grant favours the pair as well. Home Energy Scotland caps its contribution for each measure on its own terms, at £1,500 for loft insulation and £1,500 for underfloor insulation, so two measures can draw two contributions. Our guide to the floor insulation grant in Scotland explains how those caps sit inside the £7,500 limit for the whole property.
Splitting them works too. One customer had her loft and floor done with us, then came back a couple of years later for underfloor insulation in two more rooms.
How the two-crew day runs
One of our installers in the void, fixing support netting under the insulation.
Both crews arrive together, and both are made up of our own employed installers. Before anyone opens a hatch, they protect the routes through the house. From there, each crew works through its own list.
- Both crews protect the house first. Dust sheets or plastic go down from the front door to the loft hatch and to the floor hatch, and carpet protectors go on the stairs.
- The loft crew goes up and clears the working area. The crew moves stored boxes aside inside the loft and checks that air can still move in at the eaves.
- The floor crew opens up the void. Where the crawl space is deep enough, the crew goes in through a hatch. Where it is too shallow, they lift boards in planned sections, one room at a time.
- The first loft layer goes down between the joists, while underneath the house the floor crew presses Knauf Omnifit 40 between the floor joists and fixes support netting across the underside to hold it up.
- The second loft layer goes across the joists to reach 300mm in total, and the crew insulates the water tank, the pipes and the loft hatch.
- The floor crew keeps the air bricks clear, fitting vent extenders where the insulation would otherwise crowd them, and puts back any lifted boards the same day.
- Both crews photograph the finished work and clean up. You can look into the loft before the hatch closes, and the photos cover the floor void and anything else you can’t reach.
The crews share the front door, the hall and the stairs, and nothing else. Once those are covered, the loft crew stays above the top-floor ceiling and the floor crew stays in the void or in one room at a time, so you can stay in the house all day.
Ask at your free survey if your house suits a two-crew day, and we will tell you which crew goes where.
Book Your Free Survey →“Calum sent two crews, one for underfloor and the other for the loft… It was a stress-free experience for me and I felt the reduction in draughts the moment the underfloor insulation was installed.”
Susannah Silver
Loft and underfloor insulation · Google review
How long does loft insulation take on its own?
A loft with the first layer of insulation laid between the joists.
On a standard loft, one crew finishes in a day or less, so on a two-crew job the loft is usually done by the time the floor crew packs up. “Standard” means a loft you can get into through an existing hatch, with open joists, no boarded floor in the way and nothing unusual in the eaves. In that kind of loft the work follows a fixed order.
- The ceiling joists, with any old insulation between them checked first.
- Layer one: Knauf Earthwool cut to fit between the joists.
- Layer two: more Earthwool laid across the joists, crossing the first layer so the joist tops stop acting as cold lines, for 300mm in total.
- The water tank and pipes, wrapped so they don’t freeze once the loft space above the new layer runs colder.
- The loft hatch, insulated and sealed, because a bare hatch leaves a hole in the new layer.
Damp or crushed old insulation has to come out first, a boarded floor you want to keep comes up and goes back down, and tight eaves slow everyone. Our reviews include two awkward eaves spaces insulated and floored in less than a day, and a loft redo carried out over two days, with some unexpected challenges along the way.
For a natural loft we fit IndiTherm hemp, made in Scotland by IndiNature, to around 280mm, or wood wool or Sisalwool where those suit the loft better. Our loft insulation page covers the standard job, and you can ask for a natural material when you book.
What the underfloor crew does under your floor
Knauf Omnifit 40 held between the floor joists by support netting, photographed from the void.
Underfloor insulation needs a suspended timber floor: floorboards fixed across timber joists, with a ventilated gap underneath. That gap is where the insulation goes. A floor laid straight onto a concrete slab has nothing underneath to fill, and the surveyor checks which kind you have before anything gets quoted.
- From below: where the crawl space is deep enough to work in, the crew goes through a hatch and does the whole floor from underneath. Your carpets and furniture stay where they are.
- From above: where the void is too shallow, the crew lifts boards in planned sections, fits the insulation and refits the boards the same day, one room at a time.
- Either way, the air bricks stay clear. Moving air under the floor keeps the joists dry, so the crew fits vent extenders where insulation would block an air brick.
Our standard system is Knauf Omnifit 40, a mineral wool roll that the crew presses up between the joists. Support netting stapled across the underside of the joists holds it against the boards so it can’t sag over the years. The full specification is on our underfloor insulation page.
Where the crew can work from the crawl space, one crew fits a standard floor in about a day. You can feel fewer draughts through the floorboards as soon as the insulation and netting are in, before the loft crew has finished upstairs.
A natural hemp floor goes in from above, between airtight membranes, so the boards come up in every room and the job takes longer.
When loft and underfloor insulation takes more than a day
Floorboards lifted in one room, with the joists and the void ready for insulation.
A one-day job depends on the house. Our own reviews show the range. One customer had loft and underfloor insulation fitted over two days. Another had the floor of a large house insulated in two days on its own. A third had room-in-roof and loft insulation on a first visit and the underfloor on a second. And in one 1930s bungalow with very little crawl space, the crew came back on a different day to lift the boards in the one area they couldn’t reach from below.
The things that add time are easy to spot at a survey:
- A large ground floor. More bays between the joists means more rolls, more netting and more hours in the void.
- A shallow crawl space. If the crew can’t work from below, the boards come up room by room, and each room takes longer than a crawl-space bay.
- A boarded or cluttered loft. Lifting and relaying loft boards, or working around a loft full of storage, takes extra time.
- Old insulation that has to come out. Damp or crushed material comes out before new material goes in.
- A third measure on the same visit. Room-in-roof work is a bigger job with plasterboard and finishing, and it runs to its own timetable.
The surveyor sees the loft and the void before you book, so ask at the survey how long your job is likely to take.
If your house has a big floor or a boarded loft, ask the surveyor to look at both before you pick an install date.
Book Your Free Survey →“Loft and underfloor insulation was installed over 2 days… They turned up on the time agreed on both days, were very efficient, tidy, polite and helpful.”
David Goldring
Loft and underfloor insulation · Google review
Getting your house ready before the crews arrive
A floor access hatch, the way in for the underfloor crew.
If you are using a Home Energy Scotland grant, your application has to be approved before any work begins. Work that starts before the decision arrives can lose the grant, so the install date comes after the approval, never before it. Once you have both, the preparation at home is light.
- Clear a path from the front door to the loft hatch, and to the floor hatch if you have one.
- Bring down anything fragile or valuable stored in the loft. The crew can move boxes around inside the loft, but heirlooms are safer downstairs.
- Empty the rooms where boards come up. The surveyor tells you which rooms those are, if any.
- Keep pets in a room away from open hatches, and tell the crews about any you have.
- Tell us about anything under the floor you already know about, such as old cables, pipes or a past leak.
- Book the after-install EPC if you are using a grant. Home Energy Scotland asks for an updated EPC before it releases the funding. You pay for that EPC, and we can arrange it.
On the day, someone needs to let the crews in. After that, the crews work around you.
Mess, noise and dust on the day
A tidy finish under the floor, with the netting holding the insulation between the joists.
Insulation work makes some mess. Mineral wool sheds fibres when it’s cut, and lifting floorboards is noisy, so the crews put their effort into containing it. Our reviews describe crews taking their shoes off at the door, laying plastic all the way up the stairs and putting down carpet protectors for the trips up and down to the loft. One customer asked for the boards to be cut outside so no sawdust ended up indoors, and the crew did that.
Noise comes in bursts. Floorboards come up with a pry bar and go back down with screws or nails, and a saw runs when boards need cutting. The loft side is quieter, unrolling and laying, so anyone working from home should pick a room away from the floor crew.
Both crews clean up before they leave, and customers mention hoovered halls and houses left spotless. You also get photographs of the finished loft and floor, your record of what went in once the boards are down and the hatch is shut.
What loft and underfloor insulation costs after the grant
Mineral wool fitted between the joists of a suspended timber floor.
grant cap for loft insulation
grant cap for underfloor insulation
left to pay for a standard loft and floor together, after an approved grant
Home Energy Scotland grant terms checked 7 Oct 2026. Installed prices are our standard bands.
Each measure is priced and funded on its own. A standard loft (Knauf Earthwool to 300mm, with the hatch, tank and pipes) costs £1,000 to £2,000 installed, or £250 to £500 after an approved grant. A standard underfloor job (Knauf Omnifit 40 on support netting) costs £1,400 to £2,500, or £350 to £1,000 after the grant. Together that comes to £2,400 to £4,500 installed and £600 to £1,500 after both grants. For how the floor price moves with size and access, see our underfloor insulation cost guide.
- Home Energy Scotland pays up to 75% of the cost, capped at £1,500 for the loft and £1,500 for the floor.
- Your application needs a valid EPC that lists each measure in its recommendations.
- Every measure at one property shares a £7,500 combined cap, and eligible rural and island postcodes get a £1,500 uplift that takes the whole-property cap to £9,000. A loft and a floor together use at most £3,000 of it.
- An optional interest-free loan of up to £500 per measure is available on top, for the loft and for the floor.
- Underfloor insulation needs a TrustMark-registered installer. We are TrustMark registered and PAS 2030 accredited.
- Home Energy Scotland handles your application and decides it. We answer your questions and supply the installer paperwork it asks for: the quote, our TrustMark and PAS 2030 documents and the completion photos.
The natural options cost more. A hemp loft runs £2,000 to £3,500 installed, or £500 to £2,000 after the grant, and a hemp floor with airtight membranes runs £3,000 to £5,000, or £1,500 to £3,500 after the grant. The same £1,500 cap per measure applies, so the extra cost of a natural material falls on you.
We take no deposit, and payment is due within 7 days of completion. The work comes with our 25-year workmanship guarantee.
The survey puts the price of each measure, the grant figure for each and what you pay into one written quote.
Book Your Free Survey →“Calum did a very detailed inspection of work and quote. Couldn’t have made the whole process easier and helped so much with the HES stuff. The two crews that arrived were on time and left the place clean afterwards.”
Scott Blaikie
Google review
Frequently asked questions
Loft and floor on one visit: thick mineral wool in the loft, netted insulation under the ground floor.
Can loft and underfloor insulation be done on the same day?
Yes, on a standard job. We send two crews, one to the loft and one under the floor, and they work at the same time. A large floor, a shallow crawl space or a boarded loft can stretch the work to a second day, so ask the surveyor what to expect for your house.
How long does loft insulation take?
A standard loft takes one crew a day or less: Knauf Earthwool laid to 300mm in two layers, with the hatch, water tank and pipes insulated. Lifting a boarded floor, removing old insulation or working in tight eaves adds time.
Do I need to be at home on the day?
Someone needs to let the crews in and show them the loft and floor hatches. After that, you can carry on around the work. Before they leave, you can look into the finished loft, and you get photos of the floor and the loft.
Is there a grant for loft and underfloor insulation in Scotland?
Yes. Home Energy Scotland funds up to 75% of the cost, capped at £1,500 for each measure, with an optional interest-free loan of up to £500 per measure. It decides every application, approval comes before any work starts, and underfloor work needs a TrustMark-registered installer.
Will you move my furniture?
Where the crew works from the crawl space, your furniture and carpets stay put. Where boards have to come up, the room needs clearing, and the surveyor tells you which rooms those are. In the loft, the crew can move stored boxes aside to reach the joists.
Will loft and underfloor insulation cause damp?
The risk comes from blocked ventilation, so the crews keep it open. Under the floor, the crew keeps the air bricks clear and fits vent extenders where needed. In the loft, they leave the eaves open so air still moves above the insulation. The surveyor checks both before quoting.
If your question is missing here, bring it to the survey and ask it with your own loft hatch open.
Book Your Free Survey →“The day of the work went smoothly with the work being completed to a really high standard, the guys completely cleaning up after and providing pictures of the work they completed.”
Murray Scott
Google review
Get your loft and floor surveyed on one visit
The surveyor checks the loft and goes under the floor during the same visit, and you can ask there how long the work should take.
You get one written quote with each measure, its grant figure and what you pay, in pounds.
Or call us on 0141 465 5812







