Underfloor Insulation in Jordanhill and Scotstoun: Stop the Cold Coming Up Through the Boards
Mineral wool between the joists with the air bricks left clear, fitted in a day on a standard floor, and a Home Energy Scotland grant of up to £1,500 for eligible homes.
Underfloor insulation
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
Illustration: underfloor insulation, step by step
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
What Makes a Jordanhill or Scotstoun Ground Floor Feel Cold
If the heating is on and your feet are still cold, look below the boards.
Underfloor insulation in Jordanhill and Scotstoun closes off the open space under your ground floor, which is where the cold comes in.
-
Jordanhill’s older villas and its 1920s and 1930s houses usually stand on timber boards over that space, and so do ground-floor flats in Scotstoun’s tenements.
-
Low on the outside wall you’ll find small vents, known as air bricks, which let air flow through it.
-
Those vents keep the joists dry.
-
The same air is close to the outdoor temperature in winter, and it finds every gap between the boards and under the skirting.
-
Moving air is also what stops insulation causing damp, so it has to keep moving.
-
We fit mineral wool between the joists, support it with netting and keep every air brick open, as we do for underfloor insulation across Glasgow.
In a 1930s house with a timber floor, the space underneath can be too shallow to crawl through. The crew then lifts a run of boards, insulates from above and lays the same boards back.
As for cost, if you qualify, a Home Energy Scotland grant pays part of the floor, to a limit of £1,500. You always pay some of it yourself, and the quote shows that figure before you commit.
What we actually do
Two ways to insulate your floor, and what each one involves.
There are two ways to insulate a wooden floor with a gap underneath (a suspended timber floor), and the prices are far apart. Here is how each one is done.
From survey to aftercare
Our Process for Underfloor Insulation in Jordanhill and Scotstoun, Survey to Clean-Up
-
Step 1
Survey Visit
Calum or Lewis comes out to measure the space under the floor, check the joists and air bricks and find a way in. No date is fixed until you’ve read the written quote.
Survey first Before we recommend either job, we check how your floor is built, the space underneath it and the vents that keep that space dry. -
Step 2: the split
One of two ways, picked for your floor
-
The standard job
We fit Knauf Omnifit 40 insulation between the joists (the timber beams under your floorboards), support it so it can’t sag, and seal the gaps where draughts get in. You get a much warmer floor for roughly half the cost of the airtight job.
-
The airtight job
We lift the floor and rebuild it with hemp insulation between the joists. A membrane on the room side keeps moist indoor air out of the space under the floor, and a second membrane underneath lets damp escape. We tape every joint to stop air leaking through. It gives the best result where your floor allows it.
-
-
Step 3
Fitting Day
The crew cuts Knauf Omnifit 40 mineral wool to sit tightly between the joists, fixes support netting underneath, checks every vent and tidies up before leaving. A standard floor is a one-day job.
Air bricks kept clear We keep the air bricks (the small vents low in your outside walls) clear, so air keeps moving under the floor and the timber stays dry.Boards lifted and re-laid If we can’t get under the floor on a standard job, we lift your floorboards and put them back afterwards, taking extra care with old boards. -
Step 4
Grant Paperwork and Your Guarantee
Home Energy Scotland gets the installer paperwork from us, and you keep the floor photos and your guarantee details.
Grant funding and EPC We help with your Home Energy Scotland grant if you qualify, answer your questions about it, and provide a new EPC after the work where you need one. -
The honest bit: which level your floor needs
The standard job suits most of the floors we see. The airtight job costs more, because we rebuild the whole floor with two membranes and taped joints, and the natural insulation costs more too. We will tell you which one your floor and budget call for, and the choice is yours.
How each system goes in
Underfloor Insulation Fitted Below Your Jordanhill and Scotstoun Floorboards
Each card below shows one system building up layer by layer, the way we fit it. The pictures are illustrations.
Illustration: standard system
-
The cold void
Each line of light is a gap between your floorboards. Cold air from the air bricks comes up through those gaps and in at the skirtings, into the room you pay to heat.
-
Wool between the joists
We reach the void through one small hatch, and most floors take a day. Knauf Omnifit mineral wool, cut a touch wider than the space between joists, grips them and fills their full depth.
-
Netting underneath
Support netting fixed under the joists holds the wool up, so it can't sag over the years. We photograph it all for you, since you won't be crawling under there to look.
-
A warmer floor
On the first cold Jordanhill and Scotstoun night after we've been, the boards under your socks feel warmer than they did last winter. Up in the room, the draught at the skirtings eases off and less heat escapes through the floor.
Standard underfloor insulation with Knauf Omnifit
When there is room to work in the void below, we fit it from underneath, so your floorboards stay down and the job is usually done in a day.
Our most popular option and superb value when there is access from below. We work in subfloor spaces as shallow as 350mm, fitting 150 to 200mm Knauf Omnifit 40 rolls friction-cut to fill the full joist depth, lagging the heating pipes and fixing insulation support netting underneath so it never sags. Ventilation is kept clear, airbricks are extended where needed, and every access hatch is insulated and screwed back down. A breathable membrane and airtightness tape can be added for extra performance.
Illustration: hemp system
-
Boards up, one room at a time
We lift the floorboards to open up the joists.
-
A hammock between the joists
A thin sheet is slung between the joists and taped round its edges.
-
Hemp cut to fit
IndiTherm hemp is cut to sit snugly in each hammock.
-
Sealed, then boarded
A taped top sheet goes over the joists, then your boards go back down.
Hemp underfloor insulation with airtightness membranes
Hemp suits you if you want a natural, Scottish-made material and the best airtightness, and you are happy for the boards to come up room by room. It costs more than the standard job because the floor is lifted and every join is taped.
For a natural, higher-end floor we fit IndiTherm hemp, made in Scotland by IndiNature, working room by room. We sling a thin sheet between the joists like a hammock, tape it round the edges and cut the hemp to fit snugly inside it. A second sheet goes over the joists, taped down to keep moist room air out of the floor, before the boards go back. Installed from above it gives the highest performance with no compromise on airtightness.
Illustration: PIR board system
-
Battens at your heating level
25mm treated battens are fixed to the joists at your heating design level.
-
Foil-faced board between the joists
PIR is cut tightly to fit between the joists and rests on the battens.
-
Foam edges, taped joins
Foam seals the perimeter and foil tape covers every join.
-
Heating on top
The pipes go in above the board. Then the floor goes back on top.
PIR insulation for underfloor heating
Underfloor heating laid over a cold, ventilated void loses heat downward unless there is insulation beneath it. A foil-faced foam board (PIR) under the heating sends that warmth back up into the room, where you want it.
We recommend high-performance foil-faced PIR, fitted on 25mm treated battens set to your heating design level and cut tightly between the joists, with airtightness foam sealing the perimeter and foil tape over every join. Most underfloor heating contractors do not hold the TrustMark certification for underfloor insulation, so we carry out this element, which keeps up to £1,500 of Home Energy Scotland grant open to you if you qualify. We are happy to work alongside your contractor or recommend a trusted partner.
Underfloor Insulation Installers for Jordanhill and Scotstoun: Why Households Choose Us
-
Your share is in pounds on the quote
It lists the price with and without the Home Energy Scotland grant, so the number you’d pay is clear before you sign.
-
Buried air bricks get spotted at the survey
If a path, patio or later extension covers a vent, the quote says how we’ll open it up again.
-
Loft and floor on the same day
Some customers have had loft and underfloor insulation in one day, one crew in the roof space and one under the floor, so mention the loft when you book.
-
Pictures from under your floor
The crew photographs the finished insulation, so you see what went in without lifting a hatch yourself.
-
On the TrustMark register
Home Energy Scotland won’t fund a floor unless a TrustMark-registered installer fits it. We’re on the register and hold PAS 2030 accreditation.
-
A local crew from East Kilbride
Jordanhill and Scotstoun are 20 to 30 minutes from our base, so your survey and fitting day are ordinary local bookings.
What Underfloor Insulation Costs in Jordanhill and Scotstoun After the Grant
Standard mineral wool under a timber floor runs to £1,400 to £2,500. If you qualify, Home Energy Scotland covers up to three quarters of that, with a £1,500 ceiling for floors, leaving £350 to £1,000 for you.
- LoanInterest-free, up to £500
- InstallerTrustMark-registered
- A £2,400 floor shows how the ceiling works. Three quarters would be £1,800, but the grant stops at £1,500, so you’d pay £900.
- If you’d like a natural material, IndiTherm hemp goes in from above while the boards are lifted, wrapped in Pro Clima membranes, thin sheets that keep air out of it. Expect £3,000 to £5,000 before the grant and £1,500 to £3,500 after it.
- Alongside the grant you can ask for a loan of up to £500 for the floor, with no interest. Home Energy Scotland runs its own application and decides who qualifies, so our quote shows the grant as an estimate until it confirms.
- Home Energy Scotland’s floor insulation grant needs a TrustMark-registered installer, whichever material goes under your boards.
Three Guarantees on Every Jordanhill and Scotstoun Floor
Each floor is installed to PAS 2030, and our TrustMark registration is what lets the grant pay out on it.
What you get on every floor we insulate:
-
25-year workmanship guarantee
Your installation is covered by a 25-year workmanship guarantee.
-
TrustMark and PAS 2030 certified
Audited work that meets the standards the grant requires.
-
No deposit
There’s no deposit to pay before work starts.
-
Payment on 7-day terms
The invoice goes out on completion, with 7 days to pay.
Ask your own questions about underfloor insulation in Jordanhill and Scotstoun.
Give Calum the rough age of your house or ground-floor flat, and he’ll tell you if it’s worth sending someone out.
Underfloor Insulation Questions Jordanhill and Scotstoun Households Ask Us
The questions we hear most.
Standard mineral wool comes to £1,400 to £2,500, and with the grant your share drops to £350 to £1,000. Hemp starts higher, at £3,000 to £5,000, which the grant brings down to £1,500 to £3,500.
Book Your Free Survey ↓Yes, if you qualify: up to 75% of the cost, capped at £1,500. You can also borrow up to £500 interest-free. Home Energy Scotland makes the decision and funds only TrustMark-registered installers.
Book Your Free Survey ↓No. An upstairs flat’s floor rests on the ceiling of the flat below, so there’s no empty space to insulate. On the top floor, ask about the roof space instead.
Book Your Free Survey ↓No, provided the air bricks keep working. Air carries on moving under the wool and takes moisture away. Where a vent has been covered over, it gets opened up again so the joists stay dry.
Book Your Free Survey ↓Only if the space underneath is too tight to crawl through. With a hatch and enough depth, the crew insulates from underneath and the boards never come up. Otherwise they lift a run of boards and put the same ones back.
Not if the extension sits on concrete. A solid floor has no space underneath to fill. Telling a timber floor from a solid one takes a few checks you can do yourself before the survey.
Not usually: a standard floor is done in one day, clean-up included. A very cramped space can push it into a second day, which the survey picks up first.
Yes, all three. They’re the same short drive from our East Kilbride base, so they’re booked as normal local jobs.
Book your free underfloor survey.
Tell us about your floor and we will be in touch to arrange a survey.



