Underfloor Insulation in Leith for Ground-Floor Flats With Cold Air Beneath the Boards
A standard floor usually takes one fitting day, and Home Energy Scotland can pay up to £1,500 of the cost if your household qualifies.
Underfloor insulation
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
Illustration: underfloor insulation, step by step
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
Cold Boards Under a Leith Ground-Floor Flat
On the ground floor there’s no heated flat below to take the edge off.
The boards feel cold through your socks and a draught runs along the skirting. Underfloor insulation in Leith stops that cold under the floor, before it reaches the room.
-
In an older Leith tenement, a ground-floor or main-door flat usually has floorboards on joists over an open space.
-
Small vents low in the outside wall, called air bricks, let air through to keep the timber dry, and that air is as cold as the street.
-
A flat above a shop is a different case.
-
Along Leith Walk, plenty of first-floor flats sit over shops, and the space under those boards is the shop’s ceiling, with nothing for us to fill.
-
The same goes for an upper flat over another flat, and we’ll tell you so on the phone.
-
Insulation under the boards won’t cause damp while the vents stay open.
-
The crew fits mineral wool between the joists on netting and leaves every vent clear.
The newer flats along the waterfront usually sit on concrete, and concrete can’t be insulated from below. Vents near the bottom of the outside wall are the first clue to telling a timber floor from a solid one.
A household that qualifies gets part of the cost from Home Energy Scotland and pays the rest itself. Your quote shows both figures before you agree to anything.
What we actually do
Two ways to insulate your floor, and what each one involves.
There are two ways to insulate a wooden floor with a gap underneath (a suspended timber floor), and the prices are far apart. Here is how each one is done.
From survey to aftercare
Our Process Under a Leith Flat, Start to Finish
-
Step 1
Survey Visit
Calum or Lewis, our surveyor, checks how deep the space under your floor is, the joists, the air bricks and any hatch. The quote comes in writing, and the fitting day waits until you’ve said yes.
Survey first Before we recommend either job, we check how your floor is built, the space underneath it and the vents that keep that space dry. -
Step 2: the split
One of two ways, picked for your floor
-
The standard job
We fit Knauf Omnifit 40 insulation between the joists (the timber beams under your floorboards), support it so it can’t sag, and seal the gaps where draughts get in. You get a much warmer floor for roughly half the cost of the airtight job.
-
The airtight job
We lift the floor and rebuild it with hemp insulation between the joists. A membrane on the room side keeps moist indoor air out of the space under the floor, and a second membrane underneath lets damp escape. We tape every joint to stop air leaking through. It gives the best result where your floor allows it.
-
-
Step 3
Fitting Day
With a hatch and room to crawl, the crew works from below and your boards stay down. Without one, they lift a run of boards and relay them. A standard floor takes one day, and the crew clears up before leaving.
Air bricks kept clear We keep the air bricks (the small vents low in your outside walls) clear, so air keeps moving under the floor and the timber stays dry.Boards lifted and re-laid If we can’t get under the floor on a standard job, we lift your floorboards and put them back afterwards, taking extra care with old boards. -
Step 4
Photos and Guarantee
We send Home Energy Scotland the installer forms for your application. You keep the photos and the 25-year workmanship guarantee with your flat’s papers.
Grant funding and EPC We help with your Home Energy Scotland grant if you qualify, answer your questions about it, and provide a new EPC after the work where you need one. -
The honest bit: which level your floor needs
The standard job suits most of the floors we see. The airtight job costs more, because we rebuild the whole floor with two membranes and taped joints, and the natural insulation costs more too. We will tell you which one your floor and budget call for, and the choice is yours.
How each system goes in
Underfloor Insulation Fitted Below Your Leith Floorboards
Each card below shows one system building up layer by layer, the way we fit it. The pictures are illustrations.
Illustration: standard system
-
The cold void
Each line of light is a gap between your floorboards. Cold air from the air bricks comes up through those gaps and in at the skirtings, into the room you pay to heat.
-
Wool between the joists
We reach the void through one small hatch, and most floors take a day. Knauf Omnifit mineral wool, cut a touch wider than the space between joists, grips them and fills their full depth.
-
Netting underneath
Support netting fixed under the joists holds the wool up, so it can't sag over the years. We photograph it all for you, since you won't be crawling under there to look.
-
A warmer floor
On the first cold Leith night after we've been, the boards under your socks feel warmer than they did last winter. Up in the room, the draught at the skirtings eases off and less heat escapes through the floor.
Standard underfloor insulation with Knauf Omnifit
When there is room to work in the void below, we fit it from underneath, so your floorboards stay down and the job is usually done in a day.
Our most popular option and superb value when there is access from below. We work in subfloor spaces as shallow as 350mm, fitting 150 to 200mm Knauf Omnifit 40 rolls friction-cut to fill the full joist depth, lagging the heating pipes and fixing insulation support netting underneath so it never sags. Ventilation is kept clear, airbricks are extended where needed, and every access hatch is insulated and screwed back down. A breathable membrane and airtightness tape can be added for extra performance.
Illustration: hemp system
-
Boards up, one room at a time
We lift the floorboards to open up the joists.
-
A hammock between the joists
A thin sheet is slung between the joists and taped round its edges.
-
Hemp cut to fit
IndiTherm hemp is cut to sit snugly in each hammock.
-
Sealed, then boarded
A taped top sheet goes over the joists, then your boards go back down.
Hemp underfloor insulation with airtightness membranes
Hemp suits you if you want a natural, Scottish-made material and the best airtightness, and you are happy for the boards to come up room by room. It costs more than the standard job because the floor is lifted and every join is taped.
For a natural, higher-end floor we fit IndiTherm hemp, made in Scotland by IndiNature, working room by room. We sling a thin sheet between the joists like a hammock, tape it round the edges and cut the hemp to fit snugly inside it. A second sheet goes over the joists, taped down to keep moist room air out of the floor, before the boards go back. Installed from above it gives the highest performance with no compromise on airtightness.
Illustration: PIR board system
-
Battens at your heating level
25mm treated battens are fixed to the joists at your heating design level.
-
Foil-faced board between the joists
PIR is cut tightly to fit between the joists and rests on the battens.
-
Foam edges, taped joins
Foam seals the perimeter and foil tape covers every join.
-
Heating on top
The pipes go in above the board. Then the floor goes back on top.
PIR insulation for underfloor heating
Underfloor heating laid over a cold, ventilated void loses heat downward unless there is insulation beneath it. A foil-faced foam board (PIR) under the heating sends that warmth back up into the room, where you want it.
We recommend high-performance foil-faced PIR, fitted on 25mm treated battens set to your heating design level and cut tightly between the joists, with airtightness foam sealing the perimeter and foil tape over every join. Most underfloor heating contractors do not hold the TrustMark certification for underfloor insulation, so we carry out this element, which keeps up to £1,500 of Home Energy Scotland grant open to you if you qualify. We are happy to work alongside your contractor or recommend a trusted partner.
Underfloor Insulation Installers in Leith: Why Flat Owners Pick Us
-
Visits arranged around your tenant
If you let the flat, we can book the survey and the fitting day around the tenant and send you photos, so you needn’t come over yourself.
-
Your share on paper first
The quote puts the full price beside what’s left for you after the grant, before you agree to a date.
-
Covered air bricks dealt with in the quote
If a step, path or later paving has covered an air brick, a vent extender keeps the air moving, and its cost is already in the quote.
-
Mineral wool or Scottish hemp
Knauf Omnifit 40 mineral wool is the standard. IndiTherm hemp is the natural option, laid from above with the boards up, and the quote can price both.
-
Photos of the space you’ll never see
The crew photographs the finished insulation under your floor and sends the pictures over.
-
On the TrustMark register
Underfloor grants from Home Energy Scotland go only to jobs by TrustMark-registered installers, and we’re registered and PAS 2030 accredited.
Underfloor Insulation Cost in Leith, and the £1,500 Grant
A standard mineral wool floor costs £1,400 to £2,500. Home Energy Scotland pays up to 75% of an underfloor job, capped at £1,500, so a household that qualifies pays £350 to £1,000.
- GrantUp to 75%, capped at £1,500, if you qualify
- LoanInterest-free, up to £500
- Take a £1,500 floor. 75% of that is £1,125, so you’d pay £375. Past £2,000, 75% would go over the cap, so the grant stops at £1,500.
- IndiTherm hemp, the natural option, costs £3,000 to £5,000, and a full £1,500 grant brings that to £1,500 to £3,500. The crew lays it from above with the boards up, with a thin membrane below and above the hemp to keep draughts out of it.
- Home Energy Scotland runs the floor insulation grant and decides who qualifies. We answer your questions and send the installer paperwork, and any grant figure on our quote stays an estimate until Home Energy Scotland confirms it.
That £1,500 counts towards a £7,500 limit per home across everything you claim for. An interest-free loan from Home Energy Scotland, capped at £500 for underfloor work, can help with your share.
Three Guarantees on Every Leith Floor
Our crews fit to PAS 2030, the standard for installing insulation, and Home Energy Scotland funding needs the TrustMark registration we hold.
What you get on every floor we insulate:
-
25-year workmanship guarantee
The fitting carries a 25-year workmanship guarantee.
-
TrustMark and PAS 2030 certified
Audited work that meets the standards the grant requires.
-
No deposit
No deposit, so nothing is paid before fitting day.
-
Payment on 7-day terms
Payment is due within 7 days of completion, once the floor is finished.
Ask your own questions about underfloor insulation in Leith.
Ring Calum with three things: the floor your flat is on, whether a shop sits below, and whether you can spot small vents low on the outside wall. He’ll say if a survey is worth booking.
Underfloor Insulation in Leith: What Flat Owners Ask Us
The questions we hear most.
Standard mineral wool runs £1,400 to £2,500. With the grant, a qualifying household pays £350 to £1,000. Natural hemp is £3,000 to £5,000 before any grant.
Book Your Free Survey ↓Up to 75%, and no more than £1,500. An interest-free loan of up to £500 can go towards your share. Home Energy Scotland decides who qualifies and only funds TrustMark-registered installers.
Book Your Free Survey ↓Not while the air bricks stay open. The space under the insulation stays ventilated, and that moving air keeps the joists dry. Blocked vents are the real risk with underfloor insulation and damp, and the survey checks every one.
Book Your Free Survey ↓Not if there’s a hatch and enough depth to work below. Without that, they lift a short run of boards, work from above and relay them the same day.
Book Your Free Survey ↓Yes. We can arrange the survey and fitting day around your tenant and send you photos afterwards. Ask Home Energy Scotland which funding applies to a let property before you count on the grant.
One day for a standard floor, tidied up before they go. A shallow, cramped space can run into a second day, and you’ll know that from the survey.
Yes, on survey dates booked in ahead. Crews travel through from East Kilbride, as they do for all our underfloor insulation in Edinburgh.
Book your free underfloor survey.
Tell us about your floor and we will be in touch to arrange a survey.