Underfloor Insulation in Marchmont and Bruntsfield: A Warmer Floor for the Ground-Floor Flat
For main-door and ground-floor tenement flats: insulation tucked between the joists, the vents left open, and up to £1,500 off through Home Energy Scotland if you qualify.
Underfloor insulation
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
Illustration: underfloor insulation, step by step
-
The cold void
-
Wool between the joists
-
Netting underneath
-
A warmer floor
Underfloor Insulation in Marchmont: Why the Ground-Floor Flat Feels the Cold First
Every flat further up the stair has a warm home underneath it.
Yours has a cold gap under the boards, which is why your feet stay cold with the heating on. Underfloor insulation in Marchmont and Bruntsfield stops that cold at the source.
-
In most older tenements, the ground floor is timber boards over an open gap, with small grilles low in the outside wall (air vents) to keep the timber dry.
-
In winter the air down there is close to the temperature outside, and it rises between the boards and under the skirtings.
-
If a basement flat sits under yours, your floor is its ceiling, and there’s nothing for us to fill.
-
A cellar is a different story, since it often gives the crew room to work from below.
Damp is the usual worry, and the vents answer it. Our underfloor insulation packs mineral wool between the joists (the beams your boards rest on), held up by netting, while air carries on moving through the gap below.
Then there’s the money. Home Energy Scotland can pay up to 75% of a standard floor for a household that qualifies, and your quote shows the price with and without the grant before any date is set.
What we actually do
Two ways to insulate your floor, and what each one involves.
There are two ways to insulate a wooden floor with a gap underneath (a suspended timber floor), and the prices are far apart. Here is how each one is done.
From survey to aftercare
Our Process for a Ground-Floor Flat in Bruntsfield, Start to Finish
-
Step 1
Survey Visit
Calum or Lewis, our surveyor, looks into the gap under your floor, checks the joists and vents, and works out how the crew gets in. You read the written quote before any date goes in the diary.
Survey first Before we recommend either job, we check how your floor is built, the space underneath it and the vents that keep that space dry. -
Step 2: the split
One of two ways, picked for your floor
-
The standard job
We fit Knauf Omnifit 40 insulation between the joists (the timber beams under your floorboards), support it so it can’t sag, and seal the gaps where draughts get in. You get a much warmer floor for roughly half the cost of the airtight job.
-
The airtight job
We lift the floor and rebuild it with hemp insulation between the joists. A membrane on the room side keeps moist indoor air out of the space under the floor, and a second membrane underneath lets damp escape. We tape every joint to stop air leaking through. It gives the best result where your floor allows it.
-
-
Step 3
The Day We Fit
Knauf Omnifit 40 mineral wool goes in snug between the joists, with netting below to hold it up. A standard floor is usually done in a day, and any lifted boards go back before the crew leaves.
Air bricks kept clear We keep the air bricks (the small vents low in your outside walls) clear, so air keeps moving under the floor and the timber stays dry.Boards lifted and re-laid If we can’t get under the floor on a standard job, we lift your floorboards and put them back afterwards, taking extra care with old boards. -
Step 4
Under-Floor Photos and Your Guarantee
You get photos from under the floor and your 25-year workmanship guarantee. Home Energy Scotland receives the installer paperwork for your grant from us.
Grant funding and EPC We help with your Home Energy Scotland grant if you qualify, answer your questions about it, and provide a new EPC after the work where you need one. -
The honest bit: which level your floor needs
The standard job suits most of the floors we see. The airtight job costs more, because we rebuild the whole floor with two membranes and taped joints, and the natural insulation costs more too. We will tell you which one your floor and budget call for, and the choice is yours.
How each system goes in
Underfloor Insulation Fitted Below Your Marchmont and Bruntsfield Floorboards
Each card below shows one system building up layer by layer, the way we fit it. The pictures are illustrations.
Illustration: standard system
-
The cold void
Each line of light is a gap between your floorboards. Cold air from the air bricks comes up through those gaps and in at the skirtings, into the room you pay to heat.
-
Wool between the joists
We reach the void through one small hatch, and most floors take a day. Knauf Omnifit mineral wool, cut a touch wider than the space between joists, grips them and fills their full depth.
-
Netting underneath
Support netting fixed under the joists holds the wool up, so it can't sag over the years. We photograph it all for you, since you won't be crawling under there to look.
-
A warmer floor
On the first cold Marchmont and Bruntsfield night after we've been, the boards under your socks feel warmer than they did last winter. Up in the room, the draught at the skirtings eases off and less heat escapes through the floor.
Standard underfloor insulation with Knauf Omnifit
When there is room to work in the void below, we fit it from underneath, so your floorboards stay down and the job is usually done in a day.
Our most popular option and superb value when there is access from below. We work in subfloor spaces as shallow as 350mm, fitting 150 to 200mm Knauf Omnifit 40 rolls friction-cut to fill the full joist depth, lagging the heating pipes and fixing insulation support netting underneath so it never sags. Ventilation is kept clear, airbricks are extended where needed, and every access hatch is insulated and screwed back down. A breathable membrane and airtightness tape can be added for extra performance.
Illustration: hemp system
-
Boards up, one room at a time
We lift the floorboards to open up the joists.
-
A hammock between the joists
A thin sheet is slung between the joists and taped round its edges.
-
Hemp cut to fit
IndiTherm hemp is cut to sit snugly in each hammock.
-
Sealed, then boarded
A taped top sheet goes over the joists, then your boards go back down.
Hemp underfloor insulation with airtightness membranes
Hemp suits you if you want a natural, Scottish-made material and the best airtightness, and you are happy for the boards to come up room by room. It costs more than the standard job because the floor is lifted and every join is taped.
For a natural, higher-end floor we fit IndiTherm hemp, made in Scotland by IndiNature, working room by room. We sling a thin sheet between the joists like a hammock, tape it round the edges and cut the hemp to fit snugly inside it. A second sheet goes over the joists, taped down to keep moist room air out of the floor, before the boards go back. Installed from above it gives the highest performance with no compromise on airtightness.
Illustration: PIR board system
-
Battens at your heating level
25mm treated battens are fixed to the joists at your heating design level.
-
Foil-faced board between the joists
PIR is cut tightly to fit between the joists and rests on the battens.
-
Foam edges, taped joins
Foam seals the perimeter and foil tape covers every join.
-
Heating on top
The pipes go in above the board. Then the floor goes back on top.
PIR insulation for underfloor heating
Underfloor heating laid over a cold, ventilated void loses heat downward unless there is insulation beneath it. A foil-faced foam board (PIR) under the heating sends that warmth back up into the room, where you want it.
We recommend high-performance foil-faced PIR, fitted on 25mm treated battens set to your heating design level and cut tightly between the joists, with airtightness foam sealing the perimeter and foil tape over every join. Most underfloor heating contractors do not hold the TrustMark certification for underfloor insulation, so we carry out this element, which keeps up to £1,500 of Home Energy Scotland grant open to you if you qualify. We are happy to work alongside your contractor or recommend a trusted partner.
Why Flat Owners in Marchmont and Bruntsfield Pick Us for Their Floors
-
A first-floor flat? You’ll hear that on the phone
Tell us which floor you live on. If your floor sits over a neighbour’s flat, we say so straight away and nobody books a visit.
-
Let flats surveyed without you travelling in
Plenty of flats here are let. We agree the survey and fitting day with you and your tenant, and the photos of the finished floor come straight to you.
-
Original boards lifted with care
Where the gap is too tight to crawl, the crew raises a strip of boards, works from above, then lays every board back where it came from.
-
Covered vents spotted at the survey
If a step, a path or a raised bed has buried one of the vents, your quote says what we would do about it.
-
Natural hemp if the boards are up anyway
Renovating a flat with the floor already open? IndiTherm hemp can go in from above instead of mineral wool, and the quote prices both.
-
TrustMark registered, so the grant stays open
Home Energy Scotland funds underfloor work only through TrustMark-registered installers. Our company is one, with PAS 2030 accreditation as well.
Underfloor Insulation Grant in Marchmont: What a Flat Floor Costs
A standard underfloor job costs £1,400 to £2,500. With the Home Energy Scotland grant at up to 75%, capped at £1,500 for floors, an eligible household’s share comes to £350 to £1,000.
- GrantUp to 75%, capped at £1,500, if you qualify
- LoanInterest-free, up to £500
- Take a £1,640 floor: 75% is £1,230, so you’d pay £410. Past £2,000, the grant stops rising and stays at £1,500.
- The hemp option runs £3,000 to £5,000, which the full grant brings down to £1,500 to £3,500. Rented flats fall under separate Home Energy Scotland rules, so landlords should check with them first.
- Home Energy Scotland decides every application, and we’re on hand for your questions. An application for the floor insulation grant needs a written price, which the free survey gives you.
A home’s combined grant is capped at £7,500, whatever you claim for, and the floor’s share counts towards it. An interest-free loan of up to £500 can sit alongside the grant for underfloor work.
Three Guarantees on Every Marchmont and Bruntsfield Floor
We will tell you honestly if your Marchmont and Bruntsfield floor does not need the work, or if something else would help more first.
What you get on every floor we insulate:
-
25-year workmanship guarantee
A 25-year workmanship guarantee on the floor we fit.
-
TrustMark and PAS 2030 certified
Audited work that meets the standards the grant requires.
-
No deposit
No deposit, so you pay nothing before the crew arrives.
-
Payment on 7-day terms
Payment within 7 days of completion, once the boards are back down.
Ask your own questions about underfloor insulation in Marchmont and Bruntsfield.
Not sure what’s under your floor? If you can see small grilles low on the outside wall of your building, there’s probably a gap below, and Calum can tell you on the phone whether a survey is worth booking.
Underfloor Insulation in Bruntsfield and Marchmont: What Flat Owners Ask Us
The questions we hear most.
Standard mineral wool costs £1,400 to £2,500, or £350 to £1,000 for an eligible household with the full grant. Hemp runs £3,000 to £5,000 before the grant.
Book Your Free Survey ↓That’s for Home Energy Scotland to decide, and rented homes have their own rules. Ask them before you count on it. A qualifying household gets up to 75% of the floor cost, capped at £1,500, and can add an interest-free loan of up to £500.
Book Your Free Survey ↓No, because your floor sits over the flat below. This job suits the lowest flat in the stair, or a main-door flat with an open gap underneath.
Only if the crew can’t get underneath. Whether your floor can be insulated without lifting the floorboards depends on how deep the gap is, and the survey measures it.
Book Your Free Survey ↓It won’t while the vents stay open, because air keeps moving under the insulation and carries moisture away. The usual cause of damp after underfloor insulation is a blocked vent, which leaves the timber without fresh air.
Book Your Free Survey ↓Usually a single day. Where boards come up, they go back down before the crew leaves. A very shallow gap can add time, and the survey would tell you that first.
No, both are covered, as are the Grange, Merchiston and Newington. Crews drive through from East Kilbride, about an hour away, on days booked with you in advance, and the same team fits underfloor insulation across Edinburgh.
Book your free underfloor survey.
Tell us about your floor and we will be in touch to arrange a survey.



