Internal Wall Insulation in Airdrie, Measured Against Your Rooms
Google review
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Illustration: a vapour-open system on a stone wall
-
Stripped to the stone
-
A lime parge
-
Hemp in the frame
-
Wood-wool board
-
Lime plaster with mesh
-
Finished and painted
Solid Wall Insulation in Airdrie and the Space It Takes
Internal wall insulation in Airdrie brings each outside wall about 120mm into the room.
-
In a big villa room, you’ll barely see it.
-
Next to a window or a door, you will.
-
The window reveals get deeper.
-
Skirtings, sockets and radiators move out with the wall. Every one of those needs a plan before the work starts.
-
Then there’s the stone itself.
-
Old stone walls take in rain and dry out again.
-
Seal them with foam board and they dry far more slowly. Damp can then sit in the wall where the joists rest.
-
Drumgelloch still has Regency-style villas, with later Victorian ones beside them.
-
Walls that old have no cavity to fill.
A bad job is a real risk.
The National Audit Office checked insulation done under ECO4 and GBIS.
It found major defects in around 29% of internal wall jobs and 98% of external ones, in more than 30,000 homes.
We line stone with hemp and lime internal wall insulation. It lets damp out, and builders call that vapour-open.
- Lime parge fills the hollows in the stone.
- IndiTherm hemp, made in Scotland, goes in a 45mm frame.
- Wood-wool board is fixed over the hemp.
- Two coats of lime plaster with mesh finish it.
The wall keeps drying, and the room holds more of its warmth.
Our process
Our Airdrie Process, Measured First
We start with a free survey of your walls, and you see the two systems we fit before anyone strips a wall.
-
Step 1
Free Survey and Tailored Design
Calum or Lewis, our surveyor, measures the rooms and checks the stone for damp. You get a written quote with the options your walls allow. You use it to apply to Home Energy Scotland.
-
Step 2: the split
The honest comparison
Your wall’s material, finish and modelling decide which of these two systems suits it.
-
Right for most stone
Natural system that lets stone dry
Lime + hemp or wood wool
Illustration: vapour from the room passes through each layer and the stone keeps drying. - + The wall keeps drying out
- + Can mostly be taken out again later, and keeps the stone healthy
- + Right for most solid sandstone walls
- − Costs more and takes longer to prepare and fit
- − Thicker, so you lose a little more room
-
On the right wall
Membrane system that keeps room moisture out
Pro Clima membrane + insulation
Illustration: the membrane holds vapour from the room back, before it reaches the wall. - + For brick that soaks up little water, or brick that is rendered or painted
- + Can be thinner in some cases
- − Only used where our moisture modelling shows it is safe
- − Wrong for a normal sandstone wall, which soaks up water
-
-
Step 3
Specialist Installation
After the written grant offer, we strip the wall to stone. Our lime plasterer fills and flattens it with a lime parge. Our fitters press two 50mm layers of hemp to 90mm inside a 45mm timber frame. Then they add wood wool board. Two lime coats finish it.
-
Step 4
Aftercare and Guarantee
Each layer gets a photo before it’s covered. The grant is paid once you have a new EPC. You get advice on paint for lime, and your 25-year workmanship guarantee.
-
Where we say no
What we will not do
Foam board glued onto sandstone
We won’t glue a sealed polystyrene or foam board onto a solid sandstone wall to bring the price down. If that is the only way to a cheaper quote, we will tell you so and advise against it.
Inside the wall
Your wall, insulated layer by layer
Each card shows one build going onto a wall, from bare masonry to a finished room, in the order our fitters work. The pictures are illustrations.
Illustration: heritage system
-
Stripped to the stone
Our fitters strip the old plaster and timber laths back to bare sandstone, so no hidden wood is left to rot. Cornicing on these walls comes down too, and is remade in lime after the insulation goes in.
-
A lime parge
Then a coat of lime, called a parge, goes over the stone. It fills the hollows where damp air could sit and turn to water.
-
Hemp in the frame
Our fitters press two 50mm layers of Scottish-made IndiTherm hemp into a 45mm timber frame fixed over the lime. This is the layer that keeps the heat in your room.
-
Wood-wool board
Wood-wool board, a stiff sheet of bound wood shavings, goes over the hemp next. It gives the lime plaster a solid face to grip and still lets moisture pass through.
-
Lime plaster with mesh
Lime plaster goes on next, with a mesh bedded into it.
-
Finished and painted
A smooth lime finish leaves the wall about 120mm further into the room than before. At handover you get paint guidance, so the finish keeps letting the wall dry.
Hemp, wood wool and lime on bare sandstone
This vapour-open build suits most solid sandstone walls. Each layer lets moisture pass, so the stone behind it can keep drying out.
Illustration: membrane system
-
Stripped back to brick
The old plaster comes off the inside of the wall, back to the brick.
-
Hemp packed into a frame
Our fitters pack hemp insulation into a timber frame fixed over the brick.
-
The Intello Plus membrane
A Pro Clima Intello Plus membrane goes across the frame to keep room moisture out of the wall.
-
Plasterboard and skim
Plasterboard goes over the membrane, and a skim coat finishes the wall.
Hemp and a membrane for the right brick wall
Some walls are brick, and where that brick is rendered or takes up little water, a sealed build can suit it better.
It finishes in plasterboard and a skim coat, so it goes in faster than the lime build.
At your survey, Calum or Lewis checks each outside wall, and Calum tells you which build each one suits.
Why Airdrie Stone-House Owners Choose Us
Insulation planned around how your Airdrie walls take in damp and dry out.
-
Every reveal and socket on the plan
At the survey we note each window, door and socket on the walls we’d line. You know what has to move before work starts.
-
About 120mm deep on every wall
Hemp, wood wool and lime plaster add up to about 120mm, and the thickness of internal wall insulation barely changes from wall to wall. You see the depth before you agree to it.
-
Build-ups tested before they reach your wall
We choose your build-up from designs already tested in WUFI, software that models how damp moves in a wall.
-
Our margin is smaller on hemp
Hemp and lime cost more to buy and fit than foam board. We make less on them, and we still fit them, because stone has to dry.
-
Close by, with Kilsyth just north
Airdrie is a short drive from our East Kilbride base. We line older stone homes in Kilsyth too, with the same crew.
-
On the register the grant needs
Home Energy Scotland only pays for solid wall work by a TrustMark-registered installer. We’re on it.
The honest bit: period features
Cornicing, shutters and panelling on the walls we insulate have to come off, and they can’t be saved. Cornicing on walls we don’t line stays. Once the insulation is in, our specialist lime plasterer remakes the plaster mouldings and our joiner remakes the woodwork.
What Internal Wall Insulation Costs in Airdrie, and Your Share
Lining stone walls costs £10,000 to £50,000. Typical jobs come to £14,000 to £25,000. Wall area, joinery and plaster repairs push up the cost of internal wall insulation.
- GrantUp to 75%, if you qualify
- Walls cap£7,500 in any postcode
Take a £16,000 job. 75% would be £12,000, but the grant stops at £7,500. You pay our invoice in full. Once the grant comes back, your share is £8,500.
- If you qualify, Home Energy Scotland’s main grant pays up to 75%, and £7,500 at most.
- Home Energy Scotland also offers an optional loan, up to a limit set for each measure.
- The grant is for owner-occupiers who live in the home.
- You apply, and Home Energy Scotland says who qualifies.
- You get our invoice and the installer paperwork for your claim.
Rated 5.0 on Google by homeowners across central Scotland.
Solid stone walls need to dry out, and foam board stops them.
-
1Bare solid stone
Old solid stone walls handle damp the way they always have: they soak it up, then let it dry off both the inside and the outside. They have no cavity and no plastic layer, and that works for as long as the wall can keep drying.
-
2Foil-faced foam board
Foil-backed plastic foam board or sealed foam stuck straight onto the inside of the wall stops that drying. Warm, moist air from your rooms still reaches the cold stone behind it, turns to water and has nowhere to go. That trapped water causes the damp people blame on insulation.
-
3Vapour-open build-up
Our system uses lime, hemp and wood wool, which let that moisture pass through and dry off (the trade calls this vapour-open). When we plan the layers for your wall, it stays warm and keeps drying.
Internal wall insulation in Airdrie, with the damp risk checked first.
Our designs come from WUFI modelling, computer software that tracks how heat and damp move through the wall layers over several years. A solid wall needs that long to settle to a steady moisture level: roughly five years for brick and ten for stone.
-
About 5 yearsbrick, drying to equilibrium
-
About 10 yearsstone, drying to equilibrium
For a typical stone wall, we use a set of layers we have already modelled. We model a larger, listed or unusual building from scratch, and quote that as a separate service. Either way, we can show you the damp risk as a figure on paper.
Ask your own questions about internal wall insulation in Airdrie.
Got a small room you’re unsure about? Ring Calum. He’ll tell you how 120mm would change it, and whether one wall is enough.
Ballagan Farm, Strathblane
A two-storey farmhouse under full renovation, where poor insulation had left the walls damp. We stripped the walls back to bare stone and gave them a thin coat of lime. Then we fitted IndiTherm hemp and wood-wool boards and finished the sloping ceilings and the solid sandstone walls in lime plaster. We insulated the loft with Knauf Earthwool 44.
Auchinlay House, Dunblane
An internal wall and room-in-roof project for a homeowner getting ready for a heat pump, who wanted the bedrooms comfortable all year. On the walls we used hemp, wood-wool board and lime plaster, which let the wall dry. The sloping ceilings and dormers got a sealed system of PIR foam board and Superfoil SF19+, and the upper loft got Knauf Earthwool.
Mount Hope, Bridge of Allan
The client was renovating an old sandstone wing of their period home. We fitted 100mm Sisalwool, wood-wool board and lime plaster on four walls, which lets the stone dry. On one large gable wall we took out the dropped ceiling and built an insulated vaulted ceiling in its place.
Belhaven Terrace Lane, Glasgow
A West End owner wanted the whole house warmer. We insulated the ground-floor walls from the inside and the upstairs bedrooms in the roof space. The stone walls got layers that let them dry, because this sandstone soaks up a lot of water. In the sloping ceilings, a sealed layer stops warm, moist air reaching the roof spaces.
Observatory Lane, Glasgow
Internal wall insulation for a client of Oscar J Murray Architects, part of a whole-house renovation in Glasgow’s West End. We fitted IndiTherm hemp on the stone walls, dormers and sloping ceilings, and finished the walls in lime plaster. A Pro Clima Intello membrane went on the sloping ceilings, and Contega Solido tape seals the gaps round the windows.
Protected, and built to the standard the grant requires.
Our workmanship is guaranteed for 25 years. If our workmanship fails, we come back and put it right. We take no deposit, so nothing is paid up front. Payment is on 7-day terms: you are invoiced after completion, once you have seen the finished work and the photographs, and pay within seven days.
We’re TrustMark registered and PAS 2030 accredited, with a 25-year workmanship guarantee.
-
25-year workmanship guarantee
If our work fails, we come back and fix it.
-
TrustMark and PAS 2030 certified
Audited to the standards the grant requires.
-
No deposit
We take no money before we start.
-
Payment within 7 days of completion
You get the invoice when the walls are done.
Internal Wall Insulation in Airdrie: Questions We Get
Straight answers on cost, grants, systems and coverage area.
About 120mm on each wall we line. Plan on that depth. In a small room, lining only the coldest wall can make more sense.
Each option in the quote comes with its own price and the honest case for it.
Book Your Free Survey ↓Typical jobs come to £14,000 to £25,000. Once a full £7,500 grant comes back, your share is about £6,500 to £17,500.
Yes, if Home Energy Scotland accepts you. Its main grant pays up to 75%, capped at £7,500. A TrustMark-registered installer must do the work.
Check your eligibility with Home Energy Scotland, then book the survey so your application has a written price behind it.
Book Your Free Survey ↓Drumgelloch and Victoria and Town Centre are both conservation areas. Their rules mostly cover the outside, so a lining inside is usually fine. A listed building needs consent before work starts.
Have any earlier consent papers or council letters to hand on the survey day, so we can plan the paperwork around them.
Book Your Free Survey ↓It’s far less likely with hemp and lime, which let damp out so the stone keeps drying. Foam board sealed onto stone can trap it. The survey checks for damp first.
Calum or Lewis checks for existing damp on the survey visit, so point out any patches you have noticed.
Book Your Free Survey ↓Cornicing and plaster mouldings on the outside walls come down. They are recreated in lime once the insulation is in, and at the survey we agree exactly who does that work.
Yes. Both sit close to Airdrie and are a short drive from our base.
Book Your Free Survey.
Tell us about your property and we will be in touch to arrange a survey.